Date Posted | Description | Duration | Affected Area/s |
---|---|---|---|
May 3, 2025 | Low pressure to no water and quality concerns due to the interconnection of 8″ dia. main pipeline to the 16″ dia. transmission line | May 8, 2025 | 8AM-5PM | Brgys. 1-41 and 57-59 |
May 2, 2025 | Low pressure to no water and quality concerns due to the installation of blow-off at Brgy. Dap-dap | May 3, 2025 | 1-4PM | Brgys. Dap-dap and Binanuahan |
May 1, 2025 | Low pressure to no water and quality concerns due to the valving of supply line to the 120 cu.m. cistern tank at Brgy. Buraguis | May 2, 2025 | 12MN-4AM | P-5 Brgy. Dap-dap |
April 25, 2025 | Low pressure to no water and quality concerns due to the valving of supply line to the 120 cu.m. cistern tank at Brgy. Buraguis | April 25-26, 2025 | 9PM-4AM | P-5 Brgy. Dap-dap |
April 24, 2025 | Low pressure to no water and quality concerns due to the assessment of the distribution system at Brgy. Buraguis | April 24, 2025 | Ongoing until further notice | Imperial Ridgeview Subdivision, Brgy. Buraguis |
April 24, 2025 | Low pressure to no water and quality concerns due to the replacement of the 4″ dia. gate valve at Mabinit Well #2 | April 24, 2025 | 10AM-12NN | Brgy. Mabinit |
April 14, 2025 | Low pressure to no water and quality concerns due to the assessment and repair of the 10″ dia. transmission line at Brgy. Cruzada | April 15, 2025 | 8AM-5PM | Brgys. Cruzada, Gogon, Bitano, Bagumbayan, Kawit-East Washington, Capantawan |
April 11, 2025 | Low pressure to no water and quality concerns due to the interconnection of the new 4″ dia. pipeline to the existing 10″ dia. transmission line at Brgy. Cruzada | April 14, 2025 | 8AM-5PM | Left side of F. Aquende Drive going to Albay District |
April 11, 2025 | Low pressure to no water and quality concerns due to the maintenance works at PhilHydro Inc.’s water treatment plant | 6PM of April 12, 2025 until 6AM of April 13, 2025 | Brgys. 1-41 and 57-59 |
April 8, 2025 | Low pressure to no water and quality concerns due to NGCP’s scheduled power supply interruption | April 12, 2025 | 6AM-6PM | Almost all areas of Legazpi City |
April 7, 2025 | Low pressure to no water and quality concerns due to the emergency repair of the 2″ dia. distribution line at Brgy. Buraguis | April 7, 2025 | 1:30-5PM | P-3 Brgy. Buraguis |
April 4, 2025 | Emergency relocation of distribution line at Purok 3 Brgy. Buraguis | April 4, 2025 | Ongoing until 5PM | Brgy. Buraguis |
April 2, 2025 | Low pressure to no water and quality concerns due to the installation of 4″ dia. stub-out connection from the existing 8″ dia. main pipeline at Brgy. Bigaa | April 10, 2025 | 8AM-5PM | Right side of Legazpi City-Tiwi Coastal Road going to Tiwi (from Yawa Bridge to Brgy. Bigaa) |
March 28, 2025 | Low pressure to no water and quality concerns due to the interconnection of the new 4″ dia. pipeline at Brgy. Cruzada | April 2, 2025 | 8AM-5PM | Left side of F. Aquende drive going to Albay District |
March 21, 2025 | Low pressure to no water and quality concerns due to technical issues at PhilHydro’s Inc.’s water treatment plant | March 21, 2025 | Ongoing until further notice | Brgys. 1-41 and 57-59 |
March 21-22, 2025 | Bogña Well Field, Mabinit Well Field, and Buyoan Spring Sources Genset Operation | March 21-22, 2025 | Brgys. Dita, San Joaquin, Pawa, Bogña, Tamaoyan, Mabinit, Matanag, Buyoan, Arimbay, Bigaa |
March 20, 2025 | Low pressure to no water and quality concerns due to an unscheduled maintenance at Binanuahan Pumping Station) | March 20, 2025 | Ongoing until 5PM | Brgys. Binanuahan, Buraguis, Puro, and Dap-dap |
March 12, 2025 | Low pressure to no water and quality concerns (emergency repair of distribution line leak at Bliss Site, Brgy. Bagong Abre) | March 12, 2025 | 9:30-11:30AM | Bliss Site, Brgy. Bagong Abre |
March 9, 2025 | Low pressure to no water and quality concerns due to the interconnection of the new 6″ dia. pipeline to the existing 6″ dia. pipeline at Brgy. Tamaoyan | March 11, 2025 | 8AM-5PM | Tamaoyan Road (from cor. Pawa-Tamaoyan road to Brgy. Capt. Sylvia Del Agua’s residence) |
March 6, 2025 | Emergency repair of distribution line leak at Bliss Bagong Abre | March 6 2025 | Ongoing until 5PM | Bliss Bagong Abre |
March 3, 2025 | Low pressure to no water and quality concerns due to technical issues at PhilHydro Inc.’s water treatment plant | March 3, 2025 | Ongoing until further notice | Brgys. 1-41 and 57-59 |
February 28, 2025 | Low pressure to no water and quality concerns (emergency repair of distribution line at Brgys. 27 and 28) | February 28. 2025 | Ongoing until 12NN | Brgys. 27 and 28 |
February 24, 2025 | Low pressure to no water and quality concerns (emergency repair of transmission line at Brgy. Bigaa) | February 24, 2025 | Ongoing until 5PM | Brgys. Bigaa, Arimbay, and Rawis |
February 21, 2025 | Low pressure to no water and quality concerns due to the low water supply refill of 120 cu.m. cistern tank at Imperial Ridgeview | February 21, 2025 | Ongoing until further notice | Imperial Ridgeview Subdivision |
February 21, 2025 | Low pressure to no water and quality concerns due to the leak detection activities at Brgy. Buraguis | February 21, 2025 | Ongoing until 5PM | Imperial Ridgeview Subdivision |
February 21, 2025 | Low pressure to no water and quality concerns due to low water flow | February 21, 2025 | Ongoing until further notice | Brgys. 1-41 and 57-59 |
February 12, 2025 | Emergency repair of transmission line leak at Yawa River (Mabinit Line) | February 12, 2025 | Ongoing until further notice | Brgys. Bogtong, Binanuahan East, Binanuahan West, Dap-dap, Puro, and Buraguis |
February 10, 2025 | PhilHydro Inc.’s scheduled maintnenace activity | 10PM of February 15, 2025 until 3AM of February 16, 2025 | Brgys. 1-41 and 57-59 |
February 9, 2025 | Low pressure to no water and quality concerns due to technical issues at PhilHydro Inc.’s water treatment plant | February 9, 2025 | Ongoing until further notice | Almost all areas of Legazpi City |
February 6, 2025 | Installation of 8″ dia. bypass system in Brgy. 18 – Cabagñan West and Brgy. 1 – EM’s Barrio | February 10, 2025 | 8AM-5PM | • RIght side going to Legazpi proper (from BU Main Campus to Sagpon Bridge 2) • Anahaw VIllage • Right side going to Legazpi Propert (from City Hope Church to Prieto Cargo Forwarders) • Both sides along Binanuahan Road (from Makabalo bridge to J.P. Rizal Avenue) |
January 31, 2025 | Emergency repair of distribution line leak at Brgy. Rawis | January 31, 2025 | Ongoing until 9PM | P-4 Brgy. Rawis (Coastal Area) |
January 28, 2025 | Low pressure to no water and quality concerns due to the installation of air release valve in the 20HP pump at the Binanuahan Pumping Station | January 28, 2025 | Ongoing until 2:30PM | Portion of Brgys. Binanauhan and Dap-dap |
January 27, 2025 | Interconnection of 3″ dia. distribution pipeline to the existing 6″ dia. main pipeline along Tahao Road | January 30, 2025 | 8AM-5PM | Portion of Brgy. Gogon (along Tahao Road – left side from corner across Redemptorist church to F. Imperial St. intersection) Portion of Brgy. Bitano (Kabisig and 1st Street, OLV) |
Jasnuary 23, 2025 | Emergency repair of 2″ dia. distirbution line leak at Bagong Pook, Rawis | January 23, 2025 | Ongoing until 3PM | Brgy. Rawis (Bagong Pook) |
January 22, 2025 | Power supply interruption affecting Bogña Well Field’s operations | January 25, 2025 | Ongoing until further notice | Brgys. Bogña, Matanag, Bagong Abre, Buyoan, Pawa, Dita, and Tamaoyan |
January 17, 2025 | Emergency repair of transmission line leak at Yawa River | January 17, 2025 | Ongoing until further notice | Brgys. Binanuahan, Dap-dap, Buraguis, and Puro |
January 15, 2025 | Repair of 12″ dia. transmission line leak at Brgy. Bogtong | January 17, 2025 | 8AM-5PM | Brgys. 42 (Talisay St., Pag-asa and Oro land Subdivision), 43, 44, 45, and 46 |
January 14, 2025 | Emergency repair of transmission line leak at Brgy. Buraguis | January 14, 2025 | Ongoing until further notice | Brgys. Buraguis (Seaview Subd., Malindang, and OLV) and Puro |
January 13, 2025 | Suspension of Bogña Wells #4 and #5’s operations due to electrical fuse trip | January 13, 2025 | Ongoing until further notice | Brgys. Matanag, Bagong Abre, and Buyoan |
January 9, 2025 | Taysan Pumping Station’s genset operation schedule | January 9, 2025 | 10AM-12NN (downtime) 12NN-8PM (genset operation) | Brgy. Taysan |
January 8, 2025 | Replacement of 4″ dia. gate valve at Ramon Santos St., Brgy. 34 | January 10, 2025 | 8AM-5PM | Brgys. 26, 25, 31, 33, and 34 |
January 7, 2025 | Temporary suspension of Binanuahan Pumping Station’s operation due to the emergency replacement of the 20HP pump | January 7, 2025 | Ongoing until 5PM | Brgys. Binanuahan, Buraguis, Puro, and Dap-dap |
January 6, 2025 | Temporary suspension of Binanuahan Pumping Station’s operations due to the emergency maintenance of the 20HP pump and motor | January 6, 2025 | Ongoing until 5PM | Brgys. Binanuahan, Buraguis, Puro, and Dap-dap |
January 3, 2025 | Emergency repair of transmission line hub at Bogña Well #5 | January 3, 2025 | Ongoing until 3PM | Brgys. Matanag, Buyoan, Bagong Abre |
December 25, 2024 | Emergency repair of distribution line leak at Bliss Site, Brgy. Bagong Abre | December 25, 2024 | Ongoing until 6PM | Bliss Site, Brgy. Bagong Abre |
December 19, 2024 | Possible low pressure due to the power interruption at PhilHydro’s water treatment plant | December 19, 2024 | Ongoing until power supply is restored | Brgys. 1-41 and 57-59 |
December 16, 2024 | Low pressure to no water and quality concerns due to the emergency repair of distribution line leak at Brgy. Bagong Abre | December 16, 2024 | From 10PM until further notice | Brgy. Bagong Abre (Bliss) |
November 22, 2024 | Emergency repair of distribution line leak at Brgy. Gogon affected by the ongoing line canal construction project of DPWH | November 22, 2024 | Ongoing until 12NN | P-5 Brgy. Gogon |
November 21, 2024 | Emergency repair of blow-offs at Renaissance Garden, Washington Drive | November 21, 2024 | 2-4PM | Renaissance Garden |
November 21, 2024 | Water supply interruption due to the installation of the booster pump at PhilHydro’s water treatment plant | 8PM of November 23 to 2AM of November 24 | Brgys. 1-41 and 57-59 |
November 19, 2024 | Low pressure to no water and quality concerns due to the unscheduled maintenance of 2″ dia. distribution line at Victory Village affected by line canal construction | November 19, 2024 | 9:30AM-12NN | Brgy. 27 |
November 17, 2024 | Bogña and Mabinit Well generator set operation | November 17, 2024 | Ongoing until electricity is restored | Brgys. Bogña, Mabinit, Matanag, Buyuan, Bagong Abre, Pawa, Dita, Tamaoyan, and San Joaquin |
November 13, 2024 | Low pressure to no water and quality concerns due to the maintenance of the 50 HP pump’s control panel at the Binanuahan pumping station | November 13, 2024 | Ongoing until 5PM | Brgy. Puro and portion of Brgy. Buraguis (OLV, Seaview Subd., Malindang) |
November 11, 2024 | Low pressure to no water and quality concerns due to the maintenance activities at PhilHydro’s water treatment plant | 6PM of November 13 until 6AM of November 14 | Brgys. 1-41 and 57-59 |
November 11, 2024 | Low pressure to no water and quality concerns due to the transmission line leak at Brgy. Bogtong | November 11, 2024 | Duration TBD | Brgys. 1-41 and 57-59 |
November 7, 2024 | Low pressure to no water due to low clear water tank level of PhilHydro’s clarifier | November 7, 2024 | Ongoing until further notice | Almost all areas of Legazpi |
November 6, 2024 | Low pressure to no water due to the suspected leak on the Mabinit transmission line | November 6, 2024 | Ongoing until further notice | Brgys. Buraguis, Dapdap, Puro, Binanuahan, and portion of Victory Village |
November 6, 2024 | Low pressure to no water and quality concerns due to the critical water level of the 120 cu.m. cistern tank | November 6, 2024 | Ongoing until normal water level has been reached | Brgys. Dapdap, Victory Village, Imperial Ridgeview |
November 5, 2024 | Emergency repair of 6″ dia. distribution line leak at Brgy. Tamaoyan | November 5, 2024 | Ongoing until 5PM | Brgys. Tamaoyan and Rawis |
November 5, 2024 | Low pressure to no water and quality concerns | November 7, 2024 | 8AM-5PM | Portion of Brgy. Arimbay (Arimbay barangay road going to P-5 from corner of Legazpi-Tiwi coastal road) |
November 3, 2024 | Low pressure to no water due to the desilting of the Yawa source chamber | November 3, 2024 | Ongoing until further notice | Almost all areas of Legazpi |
October 31, 2024 | Low pressure to no water and quality concerns due to the emergency shutdown of PhilHydro’s pump | October 31, 2024 | Ongoing until further notice | Almost all areas of Legazpi |
October 30, 2024 | Low pressure to no water and quality concerns due to the emergency shutdown of PhilHydro’s cistern pump | October 30, 2024 | Ongoing until further notice | Almost all areas of Legazpi |
October 29, 2024 | Low pressure to no water and quality concerns due to NGCP’s power interruption at PhilHydro | October 29, 2024 | Ongoing until 6PM | Almost all areas of Legazpi |
October 29, 2024 | Adjusted schedule of water supply augmentation of lorry truck at Brgy. Taysan: 5AM – Ibalong VIllage 1PM – Centro Taysan | October 29, 2024 | Brgy. Taysan |
October 26, 2024 | Adjusted schedule of operations of the Mabinit source: 5AM-9AM 5PM-9PM | October 27, 2024 | Brgy. Mabinit |
October 25, 2024 | Mabinit line closure due to leakage | October 25, 2024 | Brgys. Binanuahan, Buraguis, Puro, Dap-dap, and Victory Village |
October 25, 2024 | Maintenance of Mabinit Well’s generator set and its operations | October 25, 2024 | Brgy. Mabinit |
October 22, 2024 | Suspension of operations of Binanuahan in-line pumping station due to flooding | October 22, 2024 | Ongoing until further notice | Brgys. Binanuahan, Victory Village, Dap-dap, Puro, and Buraguis |
October 22, 2024 | Low pressure to no water and quality concerns due to the power supply interruption at Brgy. Mabinit | October 22, 2024 | Ongoing until further notice | Brgy. Mabinit |
October 22, 2024 | Quality concerns due to technical issues at PhilHydro’s filtration system | October 22, 2024 | Ongoing until further notice | Almost all areas of Legazpi |
October 22, 2024 | Suspension of augmentation of water supply thru lorry at Brgy. Taysan | October 22, 2024 | Ongoing until further notice | Brgy. Taysan |
October 21, 2024 | Emergency repair of distribution line leak at Brgy. Rawis | October 21, 2024 | 1-3PM | P-2, P-3, and P-4 of Brgy. Rawis |
October 18, 2024 | Low pressure to no water and quality concerns due to the slow water supply recharge of Binanuahan cistern tank | October 18, 2024 | Ongoing until normal water supply is restored | Brgys. Dap-dap, Binanuahan, and portion of Victory Village |
October 15, 2024 | Interconnection of existing 8″ dia, main pipeline to the 4″ dia. service connection of Ri-Ranch Corporation at Marquez St. – Brgy. 15 Ilawod East | October 17, 2024 | 8AM-5PM | Brgys. 9-15 |
October 13, 2024 | Emergency shutdown of PhilHydro’s booster pump due to high temperature | October 13, 2024 | Ongoing until further notice | Almost all areas of Legazpi City |
October 10, 2024 | Low pressure to no water and quality concerns due to the sudden power interruption at PhilHydro’s water treatment plant | October 10, 2024 | Ongoing until further notice | Almost all areas of Legazpi City |
October 10, 2024 | Unscheduled maintenance of 2″ dia. distribution line at Gogon bypass road affected by line canal construction | October 10, 2024 | 2-4PM | P-5 Brgy. Gogon |
October 9, 2024 | Emergency repair of leakage at Brgy. Rawis (near Gallera), affected by DPWH’s ongoing road construction | October 9, 2024 | 2-5PM | Brgys. Rawis, ARimbay, and Bigaa |
October 8, 2024 | Emergency repair of 8″ dia. transmission line leak at Brgy. Rawis | October 8, 2024 | 1:30-5PM | Brgys. Arimbay, Rawis, and Bonot |
October 5, 2024 | Transmission line leak repair at Brgy. Arimbay | October 5, 2024 | Ongoing until 5PM | Brgys. Rawis, Arimbay, and Bigaa |
October 5, 2024 | Emergency repair of damaged pump at Binanuahan Pumping Station | October 5, 2024 | Ongoing until 3PM | Brgys. Binanuahan, Dap-dap, Buraguis, Puro, portion of Victory Village |
October 4, 2024 | Low pressure to no water due to the critical water level of the Bigaa cistern tank | October 4, 2024 | Ongoing until further notice | Oroland Subdivision, Ecoville Subdivision, P-5 Brgy. Rawis |
October 1, 2024 | Quality concerns and low pressure to no water supply due to a power interruption that will affect Mabinit Well #2’s operation | October 2, 2024 | 8AM-5PM | Brgy. Mabinit |
October 1, 2024 | Low pressure to no water and quality concerns due to the leak repair at San Joaquin | October 1, 2024 | Brgys. Dita, San Joaquin, Buyoan, Tamaoyan, Matanag, and P-5 Rawis |
October 1, 2024 | Low pressure to no water and quality concerns due to the interruption at PHI’s water treatment plant | October 1, 2024 | Brgy. 1-41 and 57-59 |
September 27, 2024 | Low pressure to not water and quality concerns due to the critical water level of the 150 cu.m. cistern tank at Brgy. Buraguis | September 27, 2024 | Ongoing until normal water level has been reached | PBN and Seaview Subd., Brgy. Buraguis |
September 25, 2024 | Quality concerns and low pressure to no water supply due to a power interruption that will affect Mabinit Well #2’s operation | September 26, 2024 | 8AM-5PM | Brgy. Mabinit |
September 18, 2024 | Low pressure and quality concerns due to the transmission line leak at Brgy. Bogtong | September 18, 2024 | Ongoing until further notice | Almost all areas of Legazpi City |
September 18, 2024 | Quality concerns and low pressure to no water supply due to a power interruption that will affect Mabinit Well #2’s operation | September 19, 2024 | 6AM-6PM | Brgy. Mabinit |
September 18, 2024 | Low pressure and quality concerns due to the transmission line leak at Brgy. Bogtong | September 18, 2024 | Ongoing until further notice | Almost all areas of Legazpi City |
September 16, 2024 | Distribution line leak repair at Brgy. Rawis affected by road reblocking | September 16, 2025 | 2-3PM | From Gallera to 7/11 Brgy. Rawis |
September 13, 2024 | Quality concerns and low pressure to no water supply due to a power interruption that will affect Mabinit Well #2’s operation | September 13, 2024 | Ongoing until 5PM | Brgy. Mabinit |
September 10, 2024 | Low pressure to no water and quality concerns due to the critical water level of 120 cu.m. reservoir at Brgy. Buraguis | September 10, 2024 | Ongoing until normal water level of reservoir has been reached | Brgys. Dap-dap, Victory Village South, Buraguis |
September 9, 2024 | Unscheduled maintenance of 2″ dia. distribution line at Brgy. Gogon affected by road construction | September 9, 2024 | Ongoing until 2:30 PM | Brgy. Gogon |
September 2, 2024 | Low pressure due to critical water level of PhilHydro’s clarified tanks | September 2, 2024 | Ongoing until further notice | Almost all areas of Legazpi City |
August 27, 2024 | Interconnection works of the 5″ dia. uPVC main pipeline extension at Rizal Street | August 29, 2024 | 8AM-5PM | Brgys. Dap-dap and Victory Village North |
August 24, 2024 | Damaged 2HP pump at Ibalong Village, Taysan | August 24, 2024 | Ongoing until further notice | Block 7, Ibalong Village Brgy. Taysan |
August 24, 2024 | Low pressure and quality concerns due to the emergency maintenance of PhilHydro’s water treatment plant | August 24, 2024 | Ongoing until further notice | Almost all areas of Legazpi City |
August 16, 2024 | Low pressure to no water due to an unscheduled maintenance of the blow-off at Brgy. Rawis | August 16, 2024 | Ongoing until 2:30PM | Starting from the back of Gallera to 7/11 Brgy. Rawis |
August 14, 2024 | Unscheduled maintenance of gate valve at Brgy. Rawis (beside Gallera) | August 14, 2024 | 2-3PM | From Gallera to back of 7/11 Brgy. Rawis |
August 13, 2024 | Unscheduled maintenance of 3″ dia. distribution line at Brgy. Rawis | August 13, 2024 | 2-4PM | From Gallera to back of 7/11 Brgy. Rawis |
August 13, 2024 | Low pressure to no water and quality concerns due to the continuous depletion of water level of 2,000 cu.m. reservoir at Brgy. Bogña | August 13, 2024 | TBD | Brgys. Pawa, Dita, San Joaquin |
August 7, 2024 | Emergency repair of distribution line leak at Armes Compound, Washington Drive, affected by road works | August 7, 2024 | TBD | Armes Compound |
August 2, 2024 | Unscheduled maintenance of blow-off at Brgy. Rawis | August 2, 2024 | 1:30-2:30 PM | P-2, P-3, P-4 Brgy. Rawis |
August 2, 2024 | Low pressure to no water and quality concerns due to valve setting adjustments | August 2, 2024 | Ongoing until 5PM | Brgys. Dap-dap, Buraguis, Puro, and Binanuahan |
August 1, 2024 | Unscheduled maintenance of blow-off at Brgy. Rawis | August 1, 2024 | 10:30-12NN | P-3 Brgy. Rawis |
July 25, 2024 | Flushing schedule | July 25, 2024 | 8PM onwards | Happy Homes Subdivision, Molave St. – Brgy. Bagumbayan Vel Amor Subd., Brgy. Cabangan West Brgy. Bitano P-2 Brgy. Gogon Sunrise Subdivision, Sweet Homes, Doña Paz Village, Central City – Brgy. Cruzada |
July 25, 2024 | Quality concerns due to the increase in water pressure | July 25, 2024 | Almost all areas of Legazpi City |
July 23, 2024 | Low pressure to no water and quality concern due to power supply interruption | Ongoing until power supply is restored | Brgy. Mabinit |
July 18, 2024 | Low pressure and quality concerns due to the transmission line leak at Brgy. Bogtong | July 18, 2024 | Almost all areas of Legazpi City |
July 18, 2024 | Emergency repair of 2″ dia. distribution line leak at P-2 Brgy. Gogon | July 18, 2024 | 5-9PM | P-2 Brgy. Gogon, Central City Subdivision |
July 18, 2024 | Low pressure to no water and quality concerns due to low water level of cistern tanks | July 18, 2024 | Imperial Ridgeview Subd., Brgy. Buraguis, Brgy. Puro, Brgy. Dap-dap |
July 12, 2024 | Unscheduled maintenance of 2″ dia. distribution line at Brgy. Bogtong affected by ongoing construction of line canal | July 12, 2024 | 1:30-3PM | P-3 and P-4 Brgy. Bogtong (left side Bogtong road going to Pawa, from Bogtong Elementary School) |
July 12, 2024 | Unclogging of pipelines at P-2 Brgy. Gogon | July 12, 2024 | Ongoing until 5PM | P-2 Brgy. Gogon |
July 12, 2024 | Emergency repair of distribution line leak at Camella Homes Subdivision, Brgy. Puro | July 12, 2024 | Ongoing until 5PM | Camella Homes Subd., Brgy. Puro |
July 10, 2024 | Emergency leak repair at Renaissance Garden | July 10, 2024 | Ongoing until 5PM | Renaissance Garden |
July 10, 2024 | Flushing schedule | July 10, 2024 | 1PM onwards | Central City Subd., Barriada, Gogon, Oro Site |
July 8, 2024 | Flushing schedule | July 8, 2024 | 8PM onwards | Brgys. 18, 33, 34, 37, 38, 39, 40 |
July 8, 2024 | Quality concerns due to the clarifier’s initial testing phase | Ongoing | Brgys. 1-41 and 57-59 |
July 4, 2024 | Emergency repair of Taysan Well #2 | July 4, 2024 | Ongoing until 8PM | Brgy. Taysan |
July 2, 2024 | Quality concerns due to the continuous adjustment of PHI’s water treatment plant operations | July 2, 2024 | Brgys. 1-41 and 57-59 |
July 1, 2024 | Non-delivery of water supply to Brgy. Taysan due to the emergency maintenance of LCWD’s lorry truck | July 1, 2024 | Brgy. Taysan |
July 1, 2024 | Interconnection of temporarily relocated 8″ dia. main pipeline along Arimbay bridge affected by DPWH bridge widening project | July 3, 2024 | 8AM-5PM | Left side going to Tabaco City from UST Legazpi to Bigaa |
June 26, 2024 | Low pressure and quality concerns due to the dry run testing of PhilHydro, Inc.’s clarifier | June 27, 2024 | 8PM onwards | Brgys. 1-41 and 57-59 |
June 26, 2024 | Relocation of 2″ dia. water meter of BRHMC affected by the construction of new BRHMC building | June 26, 2024 | 1:30-5PM | BRHMC and portion of Brgy. Bagtang |
June 21, 2024 | Unscheduled maintenance of distribution line at P-1 Brgy. 24 affected by the ongoing line canal construction | June 21, 2024 | 9AM-12NN | P-1 Brgy. 24 |
June 20, 2024 | Low pressure and quality concerns due to the ongoing dry run testing of PhilHydro Inc.’s clarifier | June 20, 2024 | Ongoing until further notice | Brgys. 1-41 and 57-59 |
June 13, 2024 | Non-delivery of water supply to Brgy. Taysan due to the emergency maintenance of LCWD’s lorry truck | June 13, 2024 | Today until further notice | Brgy. Taysan |
June 13, 2024 | Unscheduled maintenance of 2″ dia. distribution line at P-5 Brgy. Gogon affected by the ongoing construction of line canal | June 13, 2024 | Ongoing until 12NN | P-5 Brgy. Gogon |
June 5, 2024 | Emergency repair of 3″ dia. distribution line leak at Brgy. Bogtong affected by road construction | June 5, 2024 | Ongoing until 12NN | Brgy. Bogtong |
June 1, 2024 | Non-delivery of water supply to Brgy. Taysan due to the emergency maintenance of LCWD’s lorry truck | June 3, 2024 | Brgy. Taysan |
May 31, 2024 | Unscheduled maintenance of 2″ dia. distribution line at Brgy. Gogon affected by ongoing construction of line canal | May 31, 2024 | 9:30AM-12NN | P-5 Brgy. Gogon |
May 27, 2024 | Unscheduled maintenance of 4″ dia. distribution line affected by ongoing construction of line canal | May 27, 2024 | 1:30PM-4PM | From Children International Legazpi Office to Ace Medical Center |
May 23, 2024 | Low pressure and quality concerns due to NGCP’s emergency power supply interruption at PhilHydro, Inc.’s water treatment plant | May 23, 2024 | Ongoing until normal power supply resumes | Almost all areas of Legazpi |
May 23, 2024 | Emergency repair of distribution line leak in front of DBP Quezon Avenue | May 23, 2024 | Ongoing until 5PM | Lapu-lapu, Dinagaan, Quezon Avenue |
May 17, 2024 | Unscheduled maintenance of 2″ dia. distribution line at P-5 Brgy. Gogon affected by the ongoing construction of line canal | May 17, 2024 | 9:30AM-12NN | P-5 Brgy. Gogon |
May 13, 2024 | 12-hour plant shutdown of PhilHydro, Inc. (PHI) due to the maintenance works at the water treatment plant | May 15-16, 2024 | 6PM (May 15) – 6PM (May 16) | Brgys. 1-41 and 57-59 |
May 13, 2024 | Interconnection of temporarily relocated 8″ dia. main pipeline along Arimbay bridge affected by DPWH bridge widening project | May 15, 2024 | 8AM-5PM | Brgys. Rawis, Arimbay, and Bigaa (right side going to Tabaco City from Regional Center Site to Bigaa) |
May 10, 2024 | Unscheduled maintenance of 4″ dia. distribution line at Brgy. Bogtong affected by ongoing construction of line canal | May 10, 2024 | Ongoing until 5PM | From Children International Legazpi Officer to Ace Medical Center |
May 10, 2024 | Unscheduled maintenance of 2″ dia. distribution line at La Playa, Brgy. Bonot affected by ongoing construction of line canal | May 10, 2024 | Ongoing until 5PM | La Playa Village, Brgy. Bonot |
May 7, 2024 | Unscheduled maintenance of 2″ dia. distribution line at P-5 Brgy. Gogon affected by the ongoing line canal construction | May 7, 2024 | 1:30-5PM | P-5 Brgy. Gogon |
May 2, 2024 | Low pressure and quality concerns due to the disconnected primary line from the primary cut-off at Bogña Well #4 | May 2, 2024 | Ongoing until further notice | Brgys. Pawa, Dita, San Joaquin, Tamaoyan, Rawis (Oroland) |
May 2, 2024 | Unscheduled maintenance of distribution line at La Playa Village, Brgy. Bonot affected by the ongoing line canal construction | May 2, 2024 | Ongoing until 3PM | La Playa Village |
April 27, 2024 | Low pressure to no water and quality concerns due to the critical level of cistern tanks and reservoirs | April 27, 2024 | Ongoing until normal water level of cistern tanks and reservoir has been reached | Camella Homes, Imperial Ridgeview, Puro, Buraguis, Dap-dap, Binanuahan |
April 26, 2024 | Low pressure to no water due to the ongoing repair of 5HP pump at PBN Pumping Station | April 26, 2024 | Ongoing until further notice | Camella Homes, Puro, Dap-dap, Binanuahan, Imperial Ridgeview, Buraguis |
April 24, 2024 | Low pressure to no water caused by damaged 5HP pump at Binanuahan Pumping Station | April 24, 2024 | Ongoing until further notice | Brgys. Binanuahan and Dap-dap |
April 24, 2024 | Relocation of 3″ dia. distribution line affected by line canal construction at P-2 Brgy. Rawis | April 24, 2024 | Ongoing until 4PM | Purok 2-5 Brgy. Rawis |
April 24, 2024 | Relocation of 3″ dia. distribution line affected by ongoing canal construction | April 24, 2024 | Ongoing until 5PM | La Playa Village and Aeroville Subdivision, Brgy. Bonot |
April 23, 2024 | Emergency repair of 8″ dia. main line leak along YMCA lane | April 23, 2024 | Ongoing until 10PM | Brgys. 1-3, portion of brgys. 8, 16, and 40 (left side of Washington Drive from rail road going to Cruzada) |
April 23, 2024 | Distribution line leak repair at Tinago, Bigaa affected by the ongoing construction of line canal | April 23, 2024 | Ongoing until 5PM | Tinago, Brgy. Bigaa |
April 19, 2024 | Unscheduled maintenance of 3″ dia. distribution line at La Playa Village, Bonot affected by the ongoing line canal construction | April 19, 2024 | Ongoing until 5PM | La Playa Village and Aeroville Subdivision, Brgy. Bonot |
April 17, 2024 | Unscheduled relocation of distribution line at Brgy. Rawis affected by the ongoing line canal construction | April 17, 2024 | 1:30-3PM | P-2 to P-5, Brgy. Rawis |
April 12, 2024 | Unscheduled relocation of distribution line at Brgy. Rawis affected by the ongoing line canal construction | April 12, 2024 | 1:30-4:30PM | P-2 to P-5 Brgy. Rawis |
April 8, 2024 | Unscheduled relocation of 2″ dia. distribution line at P-5 Brgy. Gogon affected by the ongoing line canal construction | April 8, 2024 | 1:30-5PM | P-5 Brgy. Gogon |
April 3, 2024 | Low pressure to no water and quality concerns | April 3, 2024 | Ongoing until power supply stabilizes | Mabinit, Bogña, Buyoan |
April 2, 2024 | Emergency installation of 4″ dia. check valve at Tektone Village | April 2, 2024 | Ongoing until 6PM | Phases 1 and 2 of Tektone Village |
March 21, 2024 | Emergency relocation of 3″ dia. distribution line near Gallera, Rawis affected by line canal construction | March 21, 2024 } 1-5PM | P-2, P-3 and residences/ establishments near Gallera, Brgy. Rawis |
March 21, 2024 | Commissioning of pressure control valve at Brgy. 53 Bogña and Brgy. 48 Bagong Abre | March 21, 2024 | 8AM-5PM | Along Bogña-Dita Road Along Bagong Abre-Arimbay Barangay Road |
March 13, 2024 | Emergency relocation of distribution line at La Playa Village, Brgy. Bonot affected by the ongoing line canal construction | March 13, 2024 | Ongoing until 5PM | La Playa Village and Aeroville Subdivision, Brgy. Bonot |
March 6, 2024 | Emergency repair of distribution line leak at La Playa, Brgy. Bonot affected by the ongoing line canal construction | March 6, 2024 | Ongoing until 5PM | Aeroville Subd. and La Playa Village |
March 6, 2024 | Low pressure to no water and quality concerns due to the transmission line leak repair at PhilHydro Inc.’s water treatment facility | March 6, 2024 | Ongoing until further notice | Brgys. 7, 8, 16, 21, 22, 37, 38, 39, 40, 57, 58, 59, and Centro Legazpi |
March 6, 2024 | Emergency relocation of distribution line at Brgy. Rawis affected by the ongoing line canal construction | March 6, 2024 | 9:30-11AM | P-2 and P-5 Brgy. Rawis |
March 4, 2024 | Low pressure to no water and quality concerns due to the leak at PhilHydro Inc.’s (PHI) transmission line | March 4, 2024 | Duration of repair shall be determined after PHI’s assessment | Almost all areas of Legazpi |
March 1, 2024 | Installation of pressure control valve at Brgy. 53 – Bogña | March 5, 2024 | 8AM-5PM | Along Bogña-Dita Barangay Road (from blow-off valve near frontline glass and aluminum supply to corner Dita-Pawa road) |
February 29, 2024 | Emergency relocation of 2″ dia. Distribution Line at P-5 Brgy. Gogon affected by the ongoing line canal construction | February 29, 2024 | 1:30-5PM | P-5 Brgy. Gogon |
February 29, 2024 | Replacement of Individual Water Meters at Tektone Village, Brgy. Lapu-lapu | March 1, 2024 | 8AM-5PM | Tektone Village |
February 27, 2024 | Low pressure to no water and quality concerns | February 27, 2024 | Until power supply resumes | Brgys. Binanuahan, Puro, Buraguis, and Dap-dap |
February 27, 2024 | Emergency Repair of 3″ dia. Distribution Line Leak at La Playa, Bonot Affected by the Ongoing Construction of Line Canal | February 27, 2024 | Ongoing until 11:30 AM | Aeroville and La Playa, Bonot |
February 25, 2024 | Suspension of Water Rationing at Brgy. Taysan due to the Scheduled Maintenance of LCWD’s Lorry Truck | February 27, 2024 | Brgy. Taysan |
February 23, 2024 | Installation of Pressure Control Valve at Brgy. 48 – Bagong Abre | February 27, 2024 | 8AM-5PM | Along Bagong Abre – Arimbay Rd. (from Bagong Abre Chapel to Arimbay Bridge) |
February 18, 2024 | Low pressure to no water and quality concerns due to unstable power supply | February 18, 2024 | Brgys. Pawa, Dita, San Joaquin, Tamaoyan, Matanag, Bagong Abre, and Bogña |
February 14, 2024 | Interconnection of the existing 2″ distribution pipe to the new 3″ distribution pipe at Our Lady’s Village, Bitano | February 16, 2024 | 8AM-5PM | Our Lady’s Village, Bitano |
February 13, 2024 | Low pressure to no water and quality concerns due to PhilHydro Inc.’s 6-hour plant shutdown for filter maintenance | February 17-18, 2024 | Brgys. 1-41 and 57-59 |
February 8, 2024 | Emergency relocation of 3″ dia. distribution line at P-7 Brgy. Bigaa affected by the ongoing line canal construction | February 8, 2024 | 1:30-3PM | P-7 Brgy. Bigaa |
January 29, 2024 | Installation of new water service connection for GSIS Legazpi | January 31, 2024 | 8AM-5PM | Left side of Alternate Road (from Washington Drive to Traffic Light) |
January 19, 2024 | Emergency repair of distribution line at P-7 Brgy. Bigaa | January 19, 2024 | 1:30-2:30PM | P-7 Brgy. Bigaa |
January 17, 2024 | Emergency repair of 8″ dia. main line leak at Brgy. Arimbay | January 17, 2024 | 1-5PM | Brgy. Arimbay and Brgy. Rawis |
January 16, 2024 | Emergency repair of distribution line leak at P-7 Brgy. Bigaa affected by line canal construction | January 16, 2024 | Ongoing until 3PM | P-7 Brgy. Bigaa |
January 16, 2024 | Emergency repair of distribution line leak at Brgy. Binanuahan East | January 16, 2024 | Ongoing until 3PM | Right side from Binanuahan Road to boundary of Brgy. Binanuahan East and Brgy. Dap-dap |
January 16, 2024 | Emergency repair of distribution line leak at P-7 Brgy. Bigaa affected by line canal construction | January 16, 2024 | Ongoing until 3PM | P-7 Brgy. Bigaa |
January 16, 2024 | Emergency repair of distribution line leak at Brgy. Binanuahan East | January 16, 2024 | Ongoing until 3PM | Right side from Binanuahan Road to boundary of Brgy. Binanuahan East and Brgy. Dap-dap |
January 12, 2024 | Emergency relocation of 2″ dia. distribution line at Brgy. Gogon affected by line canal construction | January 12, 2024 | 1:30-5PM | P-5 Brgy. Gogon |
January 9, 2024 | Emergency repair of distribution line leak at La Playa Village, Brgy. Bonot affected by line canal construction | January 9, 2024 | Ongoing until 5PM | La Playa Village, Brgy. Bonot |
January 4, 2024 | Low pressure and quality concerns due to the emergency replacement of saddle clamp with tee reducer along Imelda Roces Avenue | January 4, 2024 | 8AM-5PM | left side of Imelda Roces Avenue (from traffic light to Marison Hotel) |
January 3, 2024 | Emergency repair of 8″ dia. main line leak along Alternate Road, Brgy. 16 | January 4, 2024 | 8AM-5PM | Alternate Road |
December 29, 2023 | Abandon 2″ pipeline affected by road widening | December 29, 2023 | Ongoing until 5PM | Brgys. Bigaa, Arimbay, and Rawis |
December 20, 2023 | Emergency relocation of 2″ dia. distribution line at Lapu-lapu affected by line canal construction | December 20, 2023 | 1:30-3PM | Brgy. Lapu-lapu, Brgy. 27 and Brgy. 28 |
December 20, 2023 | Emergency repair of 8″ dia. main line leak along Rizal Street | December 20, 2023 | 9AM-5PM | From Sagpon bridge to boundary of Legazpi and Daraga (right side going to Daraga), Camp Simeon Ola, BRTTH and Bagtang |
December 18, 2023 | Emergency repair of 2″ dia. distribution line leak affected by line canal construction at 5th | December 18, 2023 | 2-4:30PM | 5th St. OLV, Bitano |
December 14, 2023 | Emergency repair of 2″ dia. distribution line leak affected by line canal construction at 5th St. OLV, Bitano | December 14, 2023 | Ongoing until 5PM | 5th St. OLV, Bitano |
December 14, 2023 | Emergency relocation of distribution line affected by line canal construction at P-4 Rawis | December 14, 2023 | Ongoing until 5PM | Gallera and Residences/ establishments at the back of 7/11 |
December 13, 2023 | Emergency reinstallation of the 3″ dia. distribution line affected by a TelCo’s drilling activity at Brgy. Rawis | December 13, 2023 | Ongoing until 6PM | Regional Center Site and Bagoong Pook, Rawis |
December 8, 2023 | Low pressure to no water and quality concerns due to PhilHydro Inc.’s emergency transmission line leak repair | December 8, 2023 | Duration TBD after assessment | Almost all areas of Legazpi City |
December 7, 2023 | Emergency leak repair at Brgy. Pawa | December 7, 2023 | Duration TBD after assessment | Brgys. Tamaoyan, Dita, San Joaquin, and P-5 Rawis |
December 6, 2023 | Emergency relocation of 2″ dia. Distribution Line at 5th St. OLV, Brgy. Bitano affected by line canal construction | December 6, 2023 | 1:30-5PM | 5th St. OLV, Brgy. Bitano |
December 5, 2023 | Emergency relocation of 4″ dia. Distribution Line at City Heights Subdivision, Brgy. Rawis affected by ongoing line canal construction | December 5, 2023 | Ongoing until 5PM | City Heights Subdivision and Talisay St., Brgy. Rawis |
December 4, 2023 | Emergency relocation of 2″ dia. Distribution Line at 5th St. Our Lady’s Village, Brgy. Bitano affected by the construction of line canal | December 4, 2023 | Ongoing until 5PM | 5th St. OLV, Brgy. Bitano |
December 1, 2023 | Installation of New Connection of Albay Park and Wildlife | December 5, 2023 | 8AM-5PM | Right side of Daraga-Legazpi Diversion Road, Brgy. Bogtong (from Sagrada Familia to ACE Medical Center to 5th Forward Service Support Unit, Army Support Command, Philippine Army) |
November 30, 2023 | Emergency deepening of distribution line at Imperial Ridgeview Subdivision | November 30, 2023 | Ongoing until 12NN | Portion of Imperial Ridgeview Subdivision |
November 29, 2023 | Emergency relocation of 3″ Distribution Line at P-4 Rawis affected by the ongoing construction of line canal | November 29, 2023 | 2:30-5PM | P-2 and P-4 Brgy. Rawis |
November 29, 2023 | Replacement of Yashano Mall’s flow meter | December 1, 2023 | 8AM-5PM | Brgy. Capantawan – from Terminal Road 1 (in front of Legazpi City Science High School and Yashano Mall) to IBP Road (CSC Albay Field Office) |
November 28, 2023 | Emergency relocation of 3″ Distribution Line at P-4 Rawis affected by the ongoing line canal construction | November 28, 2023 | Ongoing until 5PM | P-2 and P-4 Brgy. Rawis |
November 24, 2023 | Emergency repair of 8″ dia. PVC Pipe Leak at Brgy. Arimbay (in front of NEDA) affected by ongoing road construction | November 24, 2023 | Ongoing until 9PM | Portion of Brgy. Rawis, Arimbay, and Bigaa (right side going to Tabaco) |
November 23, 2023 | Emergency repair of main line leak at Brgy. Bogña affected by ongoing road construction | November 23, 2023 | Ongoing until 6PM | Brgy. Bogña and portion of Brgy. Dita |
November 16, 2023 | Emergency Relocation of Distribution Line near Gallera, Rawis affected by the Construction of Line Canal | November 16, 2023 | 2-5PM | P-2 Brgy. Rawis |
November 14, 2023 | Emergency relocation of distribution line at City Heights, Rawis affected by the construction of line canal | November 14, 2023 | Ongoing until 3PM | City Heights Subdivision Talisay St., Pag-asa, Rawis |
November 14, 2023 | Emergency repair of 4″ distribution line leak at Brgy. Bogña | November 14, 2023 | Ongoing until 9PM | P-7 Brgy. Bogña and P-1 and P-2 Brgy. Dita (upper portion of Bogña may also experience low pressure) |
November 13, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | November 13, 2023 | Almost all areas in Legazpi City |
November 13, 2023 | Installation of new 3″ dia. water service connection of DPWH 2nd District Engineering Office | November 15, 2023 | 8-5PM | Portion of Brgy. Cruzada and Brgy. 3 EM’s Barrio |
November 13, 2023 | Postponement of water rationing at Brgy. Taysan | November 13, 2023 | Brgy. Taysan |
November 9, 2023 | Low pressure to no water and quality concern due to PHI’s regulation of water supply | November 9, 2023 | Almost all areas in Legazpi City |
November 7, 2023 | Suspension of water rationing at Brgy. Taysan | November 7, 2023 | Brgy. Taysan |
November 3, 2023 | Emergency relocation and replacement of 2″ dia. distribution line at Brgy. Gogon affected by line canal construction | November 3, 2023 | 1:30-5PM | P-5 Brgy. Gogon |
October 25, 2023 | Interconnection of the new 3″ distribution pipeline to the existing 6″ transmission pipeline | October 25, 2023 | 8-5PM | Barriada, OLV, Sol’s Subdivision and portion of Bitano |
October 17, 2023 | Emergency relocation of distribution line at Brgy. Rawis affected by the construction of line canal | October 17, 2023 | Ongoing until 4PM | P-2 Brgy. Rawis and establishments near Gallera |
October 16, 2023 | Emergency repair of distribution line leak at Brgy. Bagumbayan | October 16, 2023 | 1-5PM | West Washington Drive to BUCIT Road |
October 15, 2023 | Emergency repair of main line leak at Brgy. Bogña | October 15, 2023 | Ongoing until 5PM | Brgy. Matanag, Bagong Abre, Buyoan, and portion of Bogña (near boundary) |
October 9, 2023 | Relocation of 8″ dia. gate valve affected by DPWH widening at Arimbay bridge | October 10, 2023 | 8-5PM | Brgy. Rawis, Arimbay, and Bigaa (right side going to Tabaco) |
October 5, 2023 | Emergency repair and relocation of 2″ dia. distribution line at P-5 Gogon affected by line canal construction | October 5, 2023 | Ongoing until 12NN | P-5 Brgy. Gogon |
October 4, 2023 | Emergency repair and relocation of 2″ dia. distribution line at Gogon affected by line canal construction | October 4, 2023 | P-5 Gogon |
October 4, 2023 | Low pressure to no water and quality concerns due to low water level of the cistern tank at Binanuahan | October 4, 2023 | Buraguis, Malindang, Puro, and portion of Ridgeview |
September 28, 2023 | Emergency relocation of 3″ dia. distribution line at San Jose St., Rawis affected by ongoing construction of drainage canal | September 28, 2023 | 2-5PM | From Gallera to 7/11 Rawis |
September 26, 2023 | Emergency replacement of Binanuahan cistern tank’s gate valve | September 26, 2023 | Ongoing until 9:30AM | Camella Homes, Puro, Buraguis, and portion of Imperial Ridgeview Subdivision |
September 23, 2023 | Low pressure to no water and quality concerns due to the critical water level at the 150 cu.m. cistern tank at Brgy. Buraguis | September 23, 2023 | Camella Homes, Imperial Ridgeview, Brgy. Buraguis, and Brgy. Puro |
September 21, 2023 | Low pressure to no water and quality concerns due to the emergency repair of the transmission line leak at Brgy. Bogton (in front of ACE Medical Center) | September 21, 2023 | Almost all areas of Legazpi City |
September 20, 2023 | Emergency repair of distribution line leak at Brgy. Bogtong | September 20, 2023 | From Children’s International office to MDS Carwash |
September 16, 2023 | Low pressure to no water and quality concerns due to the critical water level of the 2,000 cu.m. cistern tank at Brgy. Binanuahan | September 16, 2023 | Camella Homes, Brgy. Puro and Brgy. Buraguis |
September 11, 2023 | Relocation of 2″ dia. distribution line at Brgy. Gogon affected by ongoing line canal construction | September 11, 2023 | 1:30-5PM | P-5 Gogon |
September 8, 2023 | Low pressure to no water and quality concerns due to the emergency maintenance of the electrical system of LCWD’s well at Brgy. Bogña (Bogña Well #4) | September 8, 2023 | Pawa, Dita, San Joaquin, Tamaoyan, and Oro Land, Rawis |
September 6, 2023 | Low pressure and quality concerns due to PHI’s maintenance activity | September 8, 2023 | 5-3PM | Brgy. 1-41 and 57-59 |
September 6, 2023 | Emergency relocation of distribution line at Tanawan, Bigaa affected by the bridge construction | September 6, 2023 | Ongoing until 6PM | Tanawan, Bigaa |
September 6, 2023 | Relocation of 3″ dia. distribution line at Brgy. Oro site affected by construction of line canal | September 6, 2023 | 1-5PM | Brgy. Oro site and portion of Bitano |
September 5, 2023 | Low pressure and quality concerns | September 6, 2023 | 8-5PM | Bigaa, Buyoan, Bogña, Matanag, Arimbay, Rawis, Bagong Abre, Dita, San Joaquin, Tamaoyan, and Pawa |
September 5, 2023 | Emergency relocation of distribution line at P-5 Gogon affected by line canal construction | September 5, 2023 | 1:30-5PM | P-5 Gogon |
September 4, 2023 | Low pressure and quality problem due to flushing activities | September 4, 2023 | Dap-dap, Victory Village, and portion of Binanuahan |
September 4, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | September 4, 2023 | Almost all areas of Legazpi City |
August 31, 2023 | Emergency repair of main line leak at Brgy. Puro | August 31, 2023 | 5PM | Camella Homes Subdivision |
August 25, 2023 | Emergency repair of 150 cu.m. cistern tank’s refill pipe at Brgy. Buraguis | August 25, 2023 | Brgy. Buraguis and portion of Imperial Ridgeview Subdivision |
August 25, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | August 25, 2023 | Almost all areas in Legazpi City |
August 24, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | August 24, 2023 | Almost all areas in Legazpi City |
August 24, 2023 | Low pressure and quality concerns due to the emergency maintenance of the electric system of Bogña Wells 4 and 5 | August 24, 2023 | Brgy. Tamaoyan, Dita, Pawa, San Joaquin, and Oroland, Rawis |
August 23, 2023 | Interconnection of 2″ dia. distribution pipeline to 8″ main pipeline along Imelda Roces Ave. and repair of mainline leak near La Roca Veranda Suites | August 24, 2023 | 8-5PM | Portion of Brgy. Gogon and Cruzada (back of Marison Hotel to La Piazza and from Marison Hotel to Gogon Barangay Hall) |
August 22, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | August 22, 2023 | Almost all areas of Legazpi |
August 21, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | August 21, 2023 | Almost all areas of Legazpi |
August 20, 2023 | Low pressure to no water and quality concerns due to the critical water level of the 120 cu.m. cistern tank at Imperial Ridgeview Subdivision | August 20, 2023 | Imperial Ridgeview Subdivision and Brgy. Dap-dap |
August 18, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | August 18, 2023 | Almost all areas in Legazpi City |
August 17, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | August 17, 2023 | Almost all areas of Legazpi City |
August 16, 2023 | Emergency replacement of gate valve at Bliss, Bagong Abre | August 16, 2023 | Ongoing until 4PM | From Bliss to Bagong Abre Chapel |
August 15, 2023 | PHI’s 5-hour plant shutdown for the tapping of filter row to production line | August 15-16, 2023 | 10PM-3AM | Brgy. 1-41 and 57-59 |
August 15, 2023 | Emergency relocation of blow-off at Brgy. 15 affected by the construction of riprap | August 15, 2023 | 1:30-5PM | Brgy. 15 |
August 15, 2023 | Low pressure and quality concerns | August 15, 2023 | All areas in Legazpi City |
August 9, 2023 | Emergency relocation of 4″ dia. distribution line at Legazpi City Heights Subdivision, Brgy. Rawis affected by ongoing construction of drainage canal | August 9, 2023 | 1:30-4PM | Legazpi City Heights Subdivision |
August 9, 2023 | Emergency repair of 2″ dia. distribution line leak at Brgy. Gogon affected by ongoing line canal construction | August 9, 2023 | Ongoing until 12NN | P-5 Brgy. Gogon |
August 8, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | August 8, 2023 | Almost all areas in Legazpi City |
August 7, 2023 | Emergency leak repair of 2″ dia. distribution line at Barriada affected by ongoing line canal construction | August 7, 2023 | Ongoing until 5PM | Barriada |
July 31, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | July 31, 2023 | Almost all areas in Legazpi City |
July 25, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | July 25, 2023 | Almost all areas in Legazpi City |
July 18, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | July 18, 2023 | Almost all areas in Legazpi City |
July 12, 2023 | Emergency relocation of 2″ dia. distribution line at Oro Site affected by line canal construction | July 12, 2023 | ongoing until 5PM | Oro Site |
July 12, 2023 | Low pressure to no water and quality concern due to low water level of the 150 cu.m. reservoir at Buraguis | July 12, 2023 | ongoing until further notice | Brgys. Buraguis, Malindang, and Puro |
July 10, 2023 | Maintenance of pump and motor of Taysan Well No. 2 | July 11-13, 2023 | 8AM-5PM | Ibalong Village and Tognao, Brgy. Taysan |
July 10, 2023 | Low pressure to no water and quality concerns due to valve adjustments for Mabinit line utilization | July 10-11, 2023 | 3PM-5AM | Bogtong Diversion Road (from Bicol Memorial Park to corner of Sagrada Familia) |
July 10, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | July 10, 2023 | ongoing until normal supply resumes | Almost all areas in Legazpi City |
July 9, 2023 | Emergency repair of main line leak along Imelda Roces Avenue | July 9, 2023 | ongoing until further notice | Our Lady’s Village, Central City, Barriada, Bitano, and Capantawan |
July 9, 2023 | Low pressure to no water and quality concerns | July 9, 2023 | 1-8PM | Brgys. Buraguis and Dap-dap |
July 8, 2023 | Low pressure to no water and quality concerns due to the critical water level of the 120 cu.m. cistern tank at Imperial Ridgeview Subdivision | July 8, 2023 | ongoing until further notice | Imperial Ridgeview Subdivision |
July 8, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | July 8, 2023 | ongoing until further notice | Almost all areas in Legazpi City |
July 7, 2023 | Emergency excavation and installation of 3″ dia. uPVC pipe at Brgy. Bogña affected by ongoing road construction | July 7, 2023 | ongoing until 5PM | Brgy. Bogña |
July 6, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | July 6, 2023 | until normal supply resumes | Almost all areas in Legazpi City |
July 4, 2023 | Interconnection of 4″ dia. supply pipe from 2,000 cu.m. ground reservoir to the existing distribution pipeline | July 6, 2023 | 8AM-5PM | Brgys. San Joaquin, Dita, and portion of Bogña |
July 3, 2023 | Emergency elevation of 2″ dia. distribution line at Brgy. Bogtong affected by ongoing drainage construction | July 3, 2023 | 2-5PM | Brgy. Bogtong |
July 3, 2023 | Interconnection of 3″ and 2″ dia. distribution pipelines at Brgy. Dap-dap | July 3, 2023 | 8AM-5PM | Brgys. Dap-dap, Victory Village (north and south), and Imperial Ridgeview Subdivision |
July 1, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | July 1, 2023 | ongoing until further notice | Almost all areas in Legazpi City |
June 29, 2023 | Emergency repair of 8″ dia. uPVC pipe damaged by backhoe at Brgy. Bigaa (near St. Vincent Ferrer Parish) | June 29, 2023 | ongoing until further notice | Residences and establishments located at the left side going to Arimbay |
June 28, 2023 | Low pressure to no water and quality concerns due to PHI’s regulation of water supply | June 28, 2023 | ongoing until further notice | Almost all areas in Legazpi City |
June 27, 2023 | Low pressure to no water and quality concern due to high turbidity of raw water from Yawa River and Low Yield from Pawa River | June 27, 2023 | until normal supply resumes | Almost all areas in Legazpi City |
June 27, 2023 | Low pressure to no water | June 27, 2023 | ongoing until further notice | Brgys. Bogña, Matanag, Bagong Abre, Buyoan, and portion of Dita |
June 23, 2023 | Emergency repair of distribution line leak at Brgy. Cruzada, corner F. Aquende Drive and Airport Road | June 23, 2023 | ongoing until 5PM | Airport Site |
June 23, 2023 | Low pressure to no water and quality concern due to high turbidity of raw water from Yawa River and Low Yield from Pawa River | June 23, 2023 | until normal supply resumes | Almost all areas in Legazpi City |
June 21, 2023 | Low pressure to no water and quality concern due to high turbidity of raw water from Yawa River and Low Yield from Pawa River | June 21, 2023 | until normal supply resumes | Almost all areas in Legazpi City |
June 20, 2023 | Emergency relocation of 4″ uPVC pipe affected by ongoing Line Canal Construction at Brgy. Matanag | June 20, 2023 | ongoing until 4PM | Brgys. Matanag, Buyoan, and Bagong Abre |
June 16, 2023 | Emergency relocation of distribution line at City Heights Subd., Rawis affected by Line Canal Construction | June 16, 2023 | ongoing until 4PM | City Heights Subd., Rawis |
June 15. 2023 | Low pressure to no water and quality concern due to high turbidity of raw water from Yawa River and low yield from Pawa River | June 15, 2023 | until normal supply resumes | Almost all areas in Legazpi City |
June 14, 2023 | Emergency repair of 2″ distribution line leak along 5th St. OLV, Bitano | June 14, 2023 | ongoing until 5PM | 5th St. OLV, Bitano |
June 13, 2023 | Emergency repair of distribution line leak at P-3 Buraguis | June 13, 2023 | ongoing until 5PM | Malindang, P-3, and P-5, Buraguis |
June 12, 2023 | Low pressure to no water and quality concerns due to PhilHydro’s water supply regulation | June 12, 2023 | until normal supply resumes | Almost all areas in Legazpi City |
June 8, 2023 | Damaged/ leaking 16″ transmission line of PhilHydro Inc. | June 8, 2023 | Brgys. 1-41 and 57-59 |
June 7, 2023 | Low pressure and quality concern | June 8, 2023 | 7AM-5PM | Almost all areas in Legazpi City |
June 5, 2023 | Emergency repair of 8″ main line leak at Brgy. Bigaa affected by the ongoing drilling of a telecommunications company | June 5, 2023 | ongoing until 10PM | Brgys. Rawis, Arimbay, and Bigaa |
May 28, 2023 | Water interruption due to abnormal pumping operations at Mabinit and Binanuahan Pumping Stations caused by low voltage supply | May 27-28, 2023 | Brgys. Buraguis and Puro |
May 26, 2023 | Low Pressure to No Water and Quality Concern due to PhilHydro’s water supply regulation | May 26, 2023 | ongoing until normal water supply resumes | Almost all areas in Legazpi City |
May 25, 2023 | No water due to emergency water rationing at Tognao, Taysan | May 25, 2023 | 4-6PM | Ibalong Village, Taysan |
May 25, 2023 | Low Pressure to No Water and Quality Concern due to Low Water Level of the 2,000 cu.m. Reservoir at Brgy. Bogña | May 25, 2023 | Ongoing until water level increases | Brgys. Pawa, Dita, San Joaquin, Tamoyan, and Rawis (Oro Land and Pag-asa) |
May 24, 2023 | Emergency Relocation of 2″ Distribution Line at Brgy. Oro Site affected by ongoing Line Canal Construction | May 24, 2023 | 1:30-5PM | Brgys. Oro Site and portion of Bitano |
May 23, 2023 | Emergency Relocation 2″ & 3″ Distribution Line affected by Line Canal Construction at Oro Site | May 23, 2023 | 1:30-5PM | Oro Site (welcome arch) going Quezon Ave. Extension (northbound) to Oro Site High School until Oro Site Brgy. Hall |
May 19, 2023 | Emergency Cleaning of 2,000 cu.m. Reservoir at Brgy. Bogña | May 19, 2023 | ongoing until 7PM | Brgys. Pawa, Dita, San Joaquin, Tamaoyan, and Rawis (Oro Land and Pag-asa) |
May 18, 2023 | Emergency Interconnection of Main Pipeline from Bogña Pumping Station | May 19-20, 2023 | 3PM-5PM | Brgys. Pawa, Dita, San Joaquin, and upper portion of Rawis |
May 18, 2023 | Installation of New Service Connection of Makapa Land at Doña Aurora Street | May 18, 2023 | 9AM to 12NN | Balintawak Street residences and establishments near DOLE and Albay Central School |
May 17, 2023 | Installation of 12″ D.I. Gate Valve along Binanuahan Road, Brgy. Binanuahan West | May 19, 2023 | 8AM to 8PM | Brgys. Puro, Buraguis, portion of Dap-dap, Binanuahan West, and portion of Victory Village |
May 17, 2023 | Emergency Relocation of 3″ Distribution Line at Diego Silang Street affected by Line Canal Construction | May 17, 2023 | 1:30PM to 5PM | Brgys. 13, 14, and 15 |
May 16, 2023 | Emergency Relocation of 3″ Distribution Line at Diego Silang Street Legazpi CIty affected by ongoing Line Canal Construction | May 16, 2023 | 1:30PM-5PM | Brgys. 13, 14, 15, Maoyod, and Tula-tula |
May 12, 2023 | Emergency Repair of 2,000 cu.m. Cistern Tank’s 6″ dia. Refill Pipe at Brgy. Buraguis | May 12, 2023 | Ongoing until 7PM | Brgys. Puro and Buraguis |
May 12, 2023 | Emergency Repair of 8″ Main Line Leak along Rizal Street | May 12, 2023 | Ongoing until 8PM | From BU Main Campus to Sagpon Bridge 2 (right side of Rizal Street going to Old Albay) |
May 11, 2023 | Emergency Relocation of 4″ Distribution Line at Legazpi Heights Subd., Rawis affected by ongoing Line Canal Construction | May 11, 2023 | 2PM-5PM | Legazpi Heights Subd., Brgy. Rawis |
May 11, 2023 | Emergency Repositioning of Distribution Line at Diego Silang St., Tula-tula affected by ongoing Line Canal Construction | May 11, 2023 | Ongoing until 8PM | Brgys. 12, 13, 14, and 15 |
May 9, 2023 | Installation of 12″ D.I. Gate Valve along Riverside St., Brgy. Bogtong | May 11-12, 2023 | 8AM-8PM | Brgy. Bogtong |
May 3, 2023 | Low pressure to no water and quality concerns due to heavy rain | May 3, 2023 | Almost all areas in Legazpi City |
May 2, 2023 | Repair and replacement of electrical components on their transmission poles (PhilHydro activity) – may cause low pressure and quality problem | May 3, 2023 | 7AM-5:15PM | Almost all areas in Legazpi City |
April 28, 2023 | Emergency relocation of distribution line at Brgy. Oro Site affected by ongoing line canal construction | April 28, 2023 | 1:30-5PM | Brgy. Oro Site |
April 26, 2023 | Emergency relocation of distribution line at Diego Silang St. affected by ongoing line canal construction | April 26, 2023 | Ongoing until 12PM | Brgys. 13-15 |
April 19, 2023 | Emergency relocation of distribution line at Marquez St. affected by ongoing line canal construction | April 19, 2023 | 1:30-5PM | Brgys. 13-15 |
April 14, 2023 | Emergency replacement of mechanical tee reducer at Marquez St. affected by ongoing line canal construction | April 14, 2023 | 1:30-5PM | Brgys. 13-15 |
April 13, 2023 | Emergency repair of distribution line at Brgy. Buyoan affected by ongoing construction of line canal | April 13, 2023 | Ongoing until 5PM | Brgy. Buyoan |
April 13, 2023 | Emergency relocation of distribution line at Marquez St. affected by ongoing construction of line canal | April 13, 2023 | Ongoing until 5PM | Brgys. 13-15 |
April 12, 2023 | Low pressure to no water and quality concerns due to regulation of water supply by PhilHydro | April 12, 2023 | until normal water supply from PhilHydro resumes | Almost all areas of Legazpi City |
March 31, 2023 | Emergency installation of gate valve at Brgy. Tamaoyan | March 31, 2023 | 9:30AM-3PM | Brgy. Tamaoyan, Oro Land, Rawis, and nearby residences |
March 29, 2023 | Emergency relocation of 3″ dia. uPVC pipe at Marquez St. affected by ongoing line canal construction | March 29, 2023 | 9AM-12NN | Brgys. 13-15 |
Mrach 28, 2023 | Emergency relocation of 4″ dia. uPVC pipe at Marquez St. affected by line canal construction | March 28, 2023 | 1-5PM | Brgys. 13-15 |
March 27, 2023 | Emergency repair of 2″ dia. distribution line leak at Brgy. Pawa | March 27, 2023 | Ongoing until 7PM | From Pawa Elementary School to Happy Homes Greenfield |
March 22, 2023 | Low pressure and quality problems due to PhilHydro’s genset power operation | until NGCP power supply is restored | Almost all areas of Legazpi City |
March 17, 2023 | Relocation of distribution line affected by ongoing construction of drainage canal | March 18, 2023 | 9AM-12NN | Brgys. 14-15, possible low pressure concerns at Brgy. 13 |
March 16, 2023 | Emergency relocation of 4″ dia. uPVC pipe at Marquez St., Brgy. 14 affected by the ongoing construction of drainage canal | March 17, 2023 | 9AM-12NN | Brgys. 13-15, possible low pressure concerns at Brgy. 12 |
March 13, 2023 | Emergency relocation of 4″ dia. uPVC pipe at Marquez St., Brgy. 14 affected by the ongoing construction of drainage canal | March 14, 2023 | 9AM-12NN | Brgys. 13-15, possible low pressure concerns at Brgy. 12 |
March 10, 2023 | Emergency relocation of 4″ dia. uPVC pipe at Marquez St., Brgy. 14 affected by the ongoing construction of drainage canal | March 10, 2023 | 2-6PM | Brgys. 13-15, possible low pressure concerns at Brgy. 12 |
March 8, 2023 | Emergency relocation of 4″ dia. uPVC pipe at Marquez St., Brgy. 14 affected by ongoing line canal construction | March 9, 2023 | 1-6PM | Brgys. 13-15, possible low pressure concerns at Brgy. 12 |
March 8, 2023 | Emergency relocation of 4″ dia distribution line at Marquez St., Brgy. 15 Ilawod East affected by ongoing line canal construction | March 8, 2023 | Ongoing until 12NN | Brgys. 14 and 15, possible low pressure concerns at Brgy. 13 |
March 3, 2023 | Emergency relocation of 4″ dia. distribution line at Marquez St., Brgy. 15 – Ilawod East | March 3, 2023 | Ongoing until 12NN | Brgys. 14 and 15, possible low pressure concerns at Brgy. 13 |
March 2, 2023 | Emergency relocation of 4″ dia. distribution line at Brgy. 15 affected by ongoing construction of drainage canal | March 2, 2023 | Ongoing until 12NN | Brgy. 15 Ilawod East |
February 23, 2023 | Emergency relocation of 4″ dia. uPVC pipe affected by ongoing construction of drainage canal | February 23, 2023 | Ongoing until 5PM | Marquez Street |
February 20, 2023 | Emergency repair of 4″ dia. distribution line leak affected by the ongoing line canal construction | February 20, 2023 | Ongoing until 12NN | Brgy. Pawa |
February 17, 2023 | Extended flushing activity due to delayed maintenance work at PhilHydro Inc.’s plant | February 17, 2023 | ongoing until midnight | Brgys. 1-41 and 57-59 |
February 16, 2023 | Low pressure due to regulation of water Supply by Philippine Hydro, Inc. | February 16, 2023 | Almost all areas of Legazpi City |
February 14, 2023 | Scheduled Philippine Hydro Inc.’s 12-hour Total Plant Shutdown to conduct interconnection of clarifier to water treatment plant | February 16-17, 2023 | 2PM-2AM | Brgys. 1-41 and 57-59 |
February 13, 2023 | Emergency Repair of damaged fuse cut out of the two (2) wells at Brgy. Bonga causing low pressure to no water concerns | Ongoing until further notice | Brgys. Bonga, Mabinit, Matanag, and Bagong Abre |
February 8, 2023 | Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Pawa (near fish market) affected by the ongoing Line Canal Construction | Ongoing until 12NN | Brgy. Pawa |
February 5, 2023 | Interconnection of Metered Discharge Pipeline of Villa Cristina’s elevated tank to the Distribution System | February 8, 2023 | 8AM-5PM | Villa Cristina Subdivision |
February 1, 2023 | Emergency Relocation of 4″ dia. uPVC Pipe Near Pawa Elementary School affected by Construction of Drainage Canal | Ongoing until 4PM | Brgy. Pawa |
January 27, 2023 | Low Pressure to No Water and Quality Concerns | Until normal supply from PhilHydro resumes | Almost all areas of Legazpi City |
January 23, 2023 | Installation of Discharge Flow Meter at Camp Simeon Ola’s elevated Water Tank | January 27, 2023 | 8AM-5PM | Camp Simeon Ola |
January 13, 2023 | Low Pressure to No Water and Quality Concern | Until normal water supply from PhilHydro resumes | Almost all areas of Legazpi City |
January 10, 2023 | Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. 15 affected by ongoing Line Canal Construction | Ongoing until 12NN | Brgy. 15 – Ilawod East |
January 6, 2023 | Scheduled Maintenance Activity at PhilHydro, Inc’s Plant (replacement of blow-off valve) | January 11-12, 2023 | 10PM to 4AM | Brgys. 1-41, 57-59 |
December 19, 2022 | Low Pressure to No Water and Quality Concern | Until normal water supply from PhilHydro resumes | Almost all areas of Legazpi City |
December 15, 2022 | Emergency Repair of 8″ dia. Main Line Leak along Rizal St. (in front of Bicol University Main Campus) | 5PM to 10PM | Brgys. 1 EM’s Barrio, 2-EM’s Barrio South, 3-EM’s Barrio East, Sagpon, BRTTH Compound, Camp Simeon Ola, and Bagtang |
December 14, 2022 | Low Pressure to No Water at Brgy. Taysan caused by Suspension of Water Rationing due to Maintenance Check-up of Lorry Truck | December 15, 2022 | Brgy. Taysan |
December 14, 2022 | Installation of Discharge Flowmeters at the Elevated Tanks of Renaissance Garden and Villa Cristina Subdivision | Renaissance Garden – December 15 | 8AM to 5PM Villa Cristina Subdivision – December 16 | 8AM to 5PM | Renaissance Garden and Villa Cristina Subdivision |
December 14, 2022 | Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Pawa affected by Construction of Line Canal Drainage | Ongoing until 12NN | Brgys. Pawa, San Joaquin, Tamaoyan, and Dita |
December 13, 2022 | Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. 17 Ilawod | Ongoing until 2PM | Portion of Brgy. 17 – Ilawod |
December 13, 2022 | Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Pawa affected by the ongoing Construction of Line Canal Drainage | Ongoing until 11AM | Portion of Brgy. Rawis, Brgys. Dita, Pawa, Tamaoyan, and San Joaquin |
December 12, 2022 | Emergency Elevation of 2″ dia. Distribution Line at Brgy. Dita affected by ongoing Construction of Line Canal Drainage | 2PM – 5PM | Portion of Brgy. Dita (from Abadeza’s Residence to Garbin’s Residence only) |
December 12, 2022 | Low pressure to no water caused by damaged 50HP pump at Binanuahan Pumping Station | December 12, 2022 | Brgys. Puro and Buraguis |
December 6, 2022 | Installation of Discharge Flowmeters at the Overhead Tanks of Anahaw Village and Central City Subdivision | Central City Subdivision -December 7 | 8-5PM Anahaw Village – December 9 | 8-5PM | Anahaw Village and Central City Subdivision |
December 6, 2022 | Emergency repair of 4″ dia. Distribution Line Leak at Brgy. Bagong Abrea affected by ongoing Road Construction | Ongoing until 2PM | Brgy. Bagong Abre |
December 2, 2022 | Emergency Repair of Distribution Line Leak at Brgy. Dita affected by ongoing Road Construction | Ongoing until 5PM | Brgy. Dita (portion near Gabin’s residence to Abadeza’s residence) |
December 1, 2022 | Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Bagong Abre affected by ongoing Road Construction | Ongoing until 6PM | Brgys. Bagong Abre, Bogña, Matanag, (portion of) Dita, and Arimbay |
November 28, 2022 | Emergency assessment of Taysan Pumping Station | 3PM to 4PM | Brgy Taysan |
November 25, 2022 | Emergency Repair or 3″ dia. Distribution Line Leak at Brgy. Dita affected by ongoing Road Widening | Ongoing until 4PM | Brgys. Dita and San Joaquin |
November 20, 2022 | Water Storage Advisory Please save and store extra water in preparation for the gate valves’ valving activity on November 21 | November 21, 2022 | 8AM-5PM | Whole area of Legazpi City, especially areas from BRTTH to Old Albay District and Legazpi City proper |
November 17, 2022 | Valving of gate valves along the transmission pipelines at Brgy. Bogtong and simultaneous pressure monitoring and flushing within Legazpi City | November 21, 2022 | 8AM-5PM | Whole area of Legazpi City, especially areas from BRTTH to Old Albay District and Legazpi City proper |
November 15, 2022 | Low pressure to no water and quality concern | Until normal water supply from PhilHydro resumes | Almost all areas of Legazpi City |
November 9, 2022 | Emergency repair of 2″ dia. distribution line leak at the boundaries of Brgy. Bagong Abre and Brgy. Arimbay affected by ongoing line canal construction | Ongoing until 2PM | Bliss, Brgy. Bagong Abre and Brgy. Arimbay |
November 9, 2022 | Emergency repair of damaged 2″ dia. blow-off at Brgy. Buyoan affected by ongoing road widening | Ongoing until 12NN | Brgy. Buyoan and upper portion of Brgy. Matanag |
November 8, 2022 | Emergency repair of 8″ dia. Main Line leak near La Piazza hotel | Ongoing until 10PM | Right side of Imelda Roces Avenue (from Marison Hotel to traffic light) |
November 7, 2022 | Emergency replacement of 3″ dia. distribution line at the boundaries of Brgy. Arimbay and Brgy. Bagong Abre affected by ongoing construction of drainage canal | Ongoing until 5PM | Bliss, Brgy. Bagong Abre |
November 7, 2022 | Cleaning of the 150 cu.m. and 120 cu.m. ground reservoir | 9AM to 9PM | Imperial Ridgeview Subd., Brgy. 57 Dap-dap, Brgy. 27 Victory Village, and Brgy. Buraguis (OLV, PBN and Seaview) |
November 5, 2022 | Emergency Repair of 4″ Dia. Distribution Line Leak at Brgy. Bagong Abre | Ongoing until 5PM | Bliss, Brgy. Bagong Abre |
October 28-29, 2022 | Low Pressure to No Water caused by Damaged Fuse Cut Out and Primary Line of the Distribution Line of two (2) wells in Brgy, Bogña due to Fallen Tree Branch | – | Brgys. Matanag, Bagong Abre, Buyoan, and portion of Bogña |
October 28, 2022 | Installation of Flow Meter at EcoHomes Subdivision, Puro, Legazpi City | 8AM to 5PM | Portion of Puro (near EcoHomes Subd.) |
October 25, 2022 | Emergency Repair of 3″ dia. Distribution Line Leak at Brgy. San Joaquin | Ongoing until 4PM | Brgy. San Joaquin |
October 20, 2022 | Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Pawa and Brgy. Arimbay (near Arimbay Elementary and High School) affected by Road Widening | Ongoing until 2PM | Brgy. Pawa and Brgy. Arimbay |
October 19, 2022 | Emergency Repair of 2 1/2″ dia. Distribution Line Leak at Gapo, Brgy. 16 affected by Clearing Activity | Ongoing until 5PM | Gapo and Brgy. 16 |
October 17, 2022 | Interconnection Works of 4″ UPVC Pipeline Extension at P-3 Brgy. Buyoan | 8AM to 5PM | P-3 Brgy. Buyoan |
October 14, 2022 | Emergency Repair at 2″ dia. Distribution Line Leak at Brgy. Dap-dap | Ongoing until 5PM | Brgy. Dap-dap and Brgy. 27 – Victory Village |
October 9, 2022 | Emergency Repair of 3″ dia. Distrbution Line Leak near Tanchuling Hospital affected by Drilling | Ongoing until 8PM | Imperial Court Sub., Phase 2, and parts of Brgy. Tingao |
October 4, 2022 | Emergency Repair of 6″ dia. Distribution Line Leak at Gapo & Brgy. 16 | Ongoing until 8PM | Gapo, Brgy. 16, and Brgy. 17 |
September 27, 2022 | Emergency Replacement of 4 X 45″ UPVC Bend at P-3 Arimbay affected by Road Widening | Ongoing until 4PM | Connections near Arimbay Elementary School |
September 21, 2022 | Emergency Repair of 3″ Distribution Line Leak at Brgy. Dita (affected by Road Construction) | Ongoing until 5PM | Brgy. Dita |
September 16, 2022 | Replacement of 2″ Gate Valve at Brgy. Rawis (in front of Padre Pio Church) | 9AM to 5PM | Brgy. Rawis (right side going to centro of Legazpi) |
September 14, 2022 | Emergency Repair of 8″ Main Line at Brgy. Pawa Affected by Road Widening | Repair completed at 7PM | Brgys. Tamaoyan Oro Land and Rawis |
September 14, 2022 | Emergency 12″ Pipe Line Leak Repair at Brgy. Bogtong | Ongoing until 11AM | Brgy. Bogtong |
September 13, 2022 | Emergency Distribution Line Leak Repair at Brgy. Bogña | Ongoing until 12NN | Brgy. Bogña and Brgy. Dita |
September 11, 2022 | Emergency Distribution Line Leak Repair at Brgy. Bogña | Ongoing until 5PM | Brgy. Bogña and Brgy. Dita |
September 10 to 11, 2022 | Scheduled Maintenance/ Replacement of Water Treatment Plant Components at PhilHydro, Inc. and Other Major Water Supply System Facilities | 7PM (Sept. 10) to 5AM (Sept. 11) | Almost All Areas of Legazpi City |
September 10, 2022 | Emergency Distribution Line Leak Repair at Brgy. Tamaoyan | – | Brgy. Tamaoyan, Oroland, and Pag-asa, Rawis |
September 8, 2022 | Emergency Main Line Leak Repair at Rizal Street, EM’s Barrio | 8AM to 5PM | YMCA Lane, EM’s Barrio, Sagpon and Parts of Bagtang |
September 7, 2022 | Emergency Relocation of 4″ Distribution Line Affected by Road Widening at Brgy. Bogña | 1PM to 5PM | Purok 7 Brgy. Bogña |
September 7, 2022 | Emergency Relocation of Blow-off Affected by Road Widening at the Boundary of Brgy. Dita and Brgy. San Joaquin | Ongoing until 5PM | Brgy. San Joaquin (right side going to Rawis) |
September 6, 2022 | Cleaning of Mother Meter and Repair of Distribution Line Leak | Ongoing until 5PM | Brgys. Pawa and Tamaoyan |
September 1, 2022 | Emergency Leak Repair of Distribution Line affected by road widening at Pawa | Ongoing until 5PM | Brgy. Pawa, Brgy. Dita, Brgy. San Joaquin, and parts of Brgy. Tamaoyan |
August 30, 2022 | Emergency Leak Repair of Main Line affected by road widening at Pawa | 3PM to 7PM | Brgys. Pawa, Dita, San Joaquin, Tamaoyan, and Oro Land Rawis |
August 30, 2022 | Emergency Leak Repair of Distribution Line affected by Road Widening at Bliss Bagong Abre | Ongoing until 5PM | Brgys. Bagong Abre and Arimbay |
August 24, 2022 | Emergency Replacement of 3″ Gate Valve at Dita | Ongoing until 5PM | Brgys. Pawa and Dita |
August 22, 2022 | Low Water Pressure to No Water and Quality Concern due to PhilHydro’s regulation of its highly turbid water sources | – | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Vilalge, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong |
August 16, 2022 | Emergency Repair of Distribution Line affected by Road Widening at San Joaquin | Ongoing until 5PM | Brgy. San Joaquin |
August 10, 2022 | Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid Pawa source | – | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong |
August 4, 2022 | Emergency Relocation of Distribution Line affected by Road Widening at San Joaquin | Ongoing until 5PM | Brgy. San Joaquin and parts of Brgy. Dita |
August 3, 2022 | Low Water Pressure to No Water due to PhilHydro’s regulation of its highly turbid Yawa source | – | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong |
August 2, 2022 | Emergency Repair of Distribution Line at Barriada | Ongoing until 2PM | Barriada, Our Lady’s Village, and parts of Brgy. Bitano |
July 30, 2022 | Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sources | – | Almost all areas in Legazpi |
July 29, 2022 | Maintenance Work at Brgy. Bigaa | 8AM to 5PM | Brgys. Bigaa, Arimbay, and Rawis |
July 26, 2022 | Emergency Leak Repair at Brgy. Binanuahan | Ongoing until 6PM | Brgy. Dapdap, and Ridgeview Subd., Brgy. Buraguis |
July 21, 2022 | Interconnection Work at Brgy. Bigaa | 8AM to 5PM | Brgys. Bigaa, Arimbay, and Rawis |
July 20, 2022 | Emergency Water Supply Interruption due to Electrical Failure of PhilHydro’s pump | Water supply restored at 3:30PM | Almost all areas in Legazpi |
July 19, 2022 | Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sources | – | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong |
July 18, 2022 | Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sources | – | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong |
July 12, 2022 | Emergency Repair of Distribution Line at the boundary of Brgys. Dita and San Joaquin | 4PM to 10PM | Brgys. Dita and San Joaquin |
July 11, 2022 | Low Pressure to No Water due to Damaged Well at Brgy. Bonga | – | Bagong Abre, Bonga, Matanag, Buyoan, Tamaoyan, Dita, San Joaquin, portion of Pawa |
July 10, 2022 | Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sources | – | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong |
July 8, 2022 | Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sources | – | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogton |
July 7, 2022 | Interconnection work at Brgy. Bigaa | 8AM to 5PM | Brgys. Bigaa, Arimbay, and Rawis |
June 29, 2022 | Emergency Leak Repair | Ongoing until 5PM | Brgy. Barriada, Brgy. Bitano (including Our Lady’s Village) |
June 28, 2022 | Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sources | – | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogton |
June 28, 2022 | Emergency Leak Repair at San Joaquin | Ongoing until 5PM | Brgy. Dita, Brgy. San Joaquin, and Pawa Road |
June 24, 2022 | Emergency Leak Repair at Pag-Asa, Rawis | Ongoing until 8PM | Pag-Asa, Rawis |
June 20, 2022 | Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sources | – | Tula-Tula, Pinaric, Cabugao, Washington Drive, Anahaw Village, Central City, Our Lady’s Village Kabisig, and other elevated areas |
June 15, 2022 | Emergency Leak Repair at Brgy. Binanuahan (near Binanuahan pumping station) | Ongoing until 5PM | Brgy. Binanuahan |
June 13, 2022 | Emergency Leak Repair at Pawa Road | 1:50PM to 5PM | San Joaquin, Renilisan, Rawis, Talisay St., Rawis, Purok 5 Rawis, and Pag-Asa, Rawis |
June 7, 2022 | Interconnection Work at Brgy. Bogña | 8AM to 5PM | Brgys. Matanag, Buyoan, Bagong Abre, and portions of Brgy. Bogña |
June 7, 2022 | Emergency Leak Repair at Brgy. Buraguis (Ridgeview Subd.) | 1:50PM to 5PM | Brgy. Buraguis |
May 31, 2022 | Low Pressure to No Water and Water Quality Problems in almost all areas in Legazpi due to (PhilHydro’s) sources’ high turbidity level | Until supply normalizes | Almost all areas in Legazpi especially elevated areas |
May 28, 2022 | Low Pressure to No Water due to decrease in water supply from PhilHydro’s sources | Until supply normalizes | Almost all areas in Legazpi |
May 26, 2022 | Emergency Leak Repair at Tektone Village | Ongoing until 5PM | Tektone Village |
May 25, 2022 | Emergency Leak Repair at Alternate Rd. in front of Jardin de Legazpi | 5PM to 8PM | Alternate Road |
May 19, 2022 | Interconnection of Transmission Line at Brgy. 49 – Bigaa | 8AM to 5PM | Brgy. 42 – Rawis, Brgy. 47 – Arimbay, and Brgy. 49 – Bigaa |
May 18, 2022 | Emergency Leak Repair at Brgy. 22 due to the damage caused by the line canal contractor | Ongoing until 5PM | Brgy. 22 – Binanuahan, Brgy. Dap-dap, and Ridgeview Subd., Buraguis |
May 18, 2022 | Emergency Leak Repair due to the damage caused by the road widening contractor | Ongoing until 11PM | Brgys. Rawis, Arimbay, Bigaa, and San Joaquin |
May 12, 2022 | Interconnection work at Brgy. 49 – Bigaa | 8AM to 5PM | Brgy. 49 – Bigaa, Brgy. 47 – Arimbay, and Brgy. 42 – Rawis |
May 10, 2022 | Emergency Leak Repair at Brgy. 46 – San Joaquin | 3PM to 6PM | Brgy. 46 – San Joaquin |
April 27, 2022 | Emergency Leak Repair at Pag-Asa – Tamaoyan bridge due to the damage caused by the line canal contractor | Ongoing until 10PM | Brgy. 42 – Rawis (Pag-Asa and City Heights Subdivision) and Brgy. 43 – Tamaoyan |
April 13, 2022 | Emergency Leak Repair at Brgy. Bogtong | 10AM to 12NN | Brgy. Bogtong |
April 8, 2022 | Emergency Leak Repair near Metrobank Rizal St. due to the damage caused by the canal construction contractor | 8AM to 5PM | Brgys. Baybay, Pigcale, Orosite, Lapu-Lapu, Centro Legazpi (from Metrobank to St. Raphael Church), and Rizal St. (portion of centro Legazpi) |
March 30, 2022 | Emergency Leak Repair at Mabini St. due to the damage caused by the canal construction contractor | Ongoing until 10PM | Mabini St., Brgy. Sabang, Brgy. Pigcale, and Brgy. Dinagaan |
March 29, 2022 | Installation of Gate Valve at Purok 7 | 1PM to 5PM | Brgy. 52 – Matanag and Brgy. 48 – Bagong Abre (including Bliss Area) |
March 28, 2022 | Emergency Leak Repair at Brgy. 45 – Dita due to the damage caused by the road widening contractor | Ongoing until 10PM | Brgy. 45 – Dita and Brgy. 46 – San Joaquin |
March 27, 2022 | Emergency Leak Repair at Brgy. Rawis near Rawis-Arimbay bridge | Ongoing until 12MN | Brgy. Rawis including Regional Center Site |
March 26, 2022 | Emergency Leak Repair near Legazpi Savings Bank | Ongoing until 8PM | Mabini Street, Brgy. Sabang, and Brgy. Pigcale |
March 26, 2022 | Emergency Leak Repair due to the damage caused by the ongoing canal construction | Ongoing until 5PM | Brgy. Sabang and Brgy. Pigcale |
March 25, 2022 | Emergency Leak Repair at Brgy. Dita | Ongoing until 6PM | Brgy. Dita and Brgy. San Joaquin |
March 24, 2022 | Emergency Leak Repair at Brgy. Pawa Balading | Ongoing until 5PM | Brgys. Pawa, San Joaquin, Dita, Rawis (Pag-Asa and Oroland), and Tamaoyan |
March 24, 2022 | Emergency Repair at Brgy. Taysan (near barangay hall) | 9AM to 5PM | Brgy. 56 – Taysan |
March 21, 2022 | Emergency Leak Repair at Brgy. Baybay in front of Hotel St. Ellis | Ongoing until 9PM | Brgys. Pigcale, Baybay, and Sabang |
March 20, 2022 | Emergency Leak Repair at Brgy. Bogtong (near Seaoil) | Ongoing until 8PM | Portion of Brgy. Bogtong, Brgy. Bonot (Renelisan area), and areas near SM Legazpi |
March 19, 2022 | Emergency Leak Repair at Brgy. Pawa (Balading) | Ongoing until 8PM | Brgys. Tamaoyan and Pag-Asa Rawis including Oro Land Subdivision |
March 18, 2022 | Emergency Repair in Brgy Bonga | Ongoing until 11AM | Brgys. Bonga, Dita, San Joaquin, Rawis (Oro Land and and Pag-Asa), and Tamaoyan |
March 2, 2022 | Emergency Leak Repair at Brgy. Pigcale | Ongoing until 11PM | Brgys. Pigcale, Sabang, and portion of Victory Village |
February 28, 2022 | Emergency repair at Brgy. 56 – Taysan due to the damage caused by the canal construction contractor | Ongoing until 5PM | Brgy. 56 – Taysan |
February 24, 2022 | Emergency relocation of Distribution Line affected by canal construction in front of Taysan Elementary School | 8AM to 5PM | Brgy. 56 – Taysan |
February 15, 2022 | Interconnection work near Buyoan Elementary School | 9AM to 5PM | Brgys. 42 – Rawis, 47- Arimbay, and 49 – Bigaa (including Sitio Israel) |
February 10, 2022 | Emergency leak repair at Brgy. 44 – Pawa | Ongoing until 5PM | Brgys. 44 – Pawa, 46 – San Joaquin, 45 – Dita, 43 – Tamaoyan, 42 – Rawis (Pag-Asa and Oro Land) |
February 8-9, 2022 | Emergency leak repair of distribution line at Brgy. 25 – Lapu-lapu (beside Imperial appliance) | 4:30PM to 12MN | Brgy. 25 – Lapu-lapu |
January 27, 2022 | Emergency leak repair at Brgy. 31 Baybay (centro) near PNB | 9:30AM to 3PM | Brgys. Baybay, Sabang, Victory Village, and Pigcale |
January 27, 2022 | Emergency pump repair at Brgy. 54 – Mabinit | 8:30AM to 5PM | Brgy. 54 – Mabinit |
January 21, 2022 | Emergency leak repair at Brgy. Bogtong | Ongoing until 12NN | Brgy. Bogtong |
January 19, 2022 | Emergency leak repair at Bagong Abre | Ongoing until 5PM | Brgy. Bagong Abre (including Bliss area) |
January 4, 2022 | Low Water Pressure to No Water | Until PhilHydro’s supply normalizes | EM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong, Tahao Road, Gogon |