Water Service Interruption Advisories

Date PostedDescriptionDurationAffected Area/s
May 3, 2025Low pressure to no water and quality concerns due to the interconnection of 8″ dia. main pipeline to the 16″ dia. transmission lineMay 8, 2025 | 8AM-5PMBrgys. 1-41 and 57-59
May 2, 2025Low pressure to no water and quality concerns due to the installation of blow-off at Brgy. Dap-dapMay 3, 2025 | 1-4PMBrgys. Dap-dap and Binanuahan
May 1, 2025Low pressure to no water and quality concerns due to the valving of supply line to the 120 cu.m. cistern tank at Brgy. BuraguisMay 2, 2025 | 12MN-4AMP-5 Brgy. Dap-dap
April 25, 2025Low pressure to no water and quality concerns due to the valving of supply line to the 120 cu.m. cistern tank at Brgy. BuraguisApril 25-26, 2025 | 9PM-4AMP-5 Brgy. Dap-dap
April 24, 2025Low pressure to no water and quality concerns due to the assessment of the distribution system at Brgy. BuraguisApril 24, 2025 | Ongoing until further noticeImperial Ridgeview Subdivision, Brgy. Buraguis
April 24, 2025Low pressure to no water and quality concerns due to the replacement of the 4″ dia. gate valve at Mabinit Well #2April 24, 2025 | 10AM-12NNBrgy. Mabinit
April 14, 2025Low pressure to no water and quality concerns due to the assessment and repair of the 10″ dia. transmission line at Brgy. CruzadaApril 15, 2025 | 8AM-5PMBrgys. Cruzada, Gogon, Bitano, Bagumbayan, Kawit-East Washington, Capantawan
April 11, 2025Low pressure to no water and quality concerns due to the interconnection of the new 4″ dia. pipeline to the existing 10″ dia. transmission line at Brgy. CruzadaApril 14, 2025 | 8AM-5PMLeft side of F. Aquende Drive going to Albay District
April 11, 2025Low pressure to no water and quality concerns due to the maintenance works at PhilHydro Inc.’s water treatment plant6PM of April 12, 2025 until 6AM of April 13, 2025Brgys. 1-41 and 57-59
April 8, 2025Low pressure to no water and quality concerns due to NGCP’s scheduled power supply interruptionApril 12, 2025 | 6AM-6PMAlmost all areas of Legazpi City
April 7, 2025Low pressure to no water and quality concerns due to the emergency repair of the 2″ dia. distribution line at Brgy. BuraguisApril 7, 2025 | 1:30-5PMP-3 Brgy. Buraguis
April 4, 2025Emergency relocation of distribution line at Purok 3 Brgy. BuraguisApril 4, 2025 | Ongoing until 5PMBrgy. Buraguis
April 2, 2025Low pressure to no water and quality concerns due to the installation of 4″ dia. stub-out connection from the existing 8″ dia. main pipeline at Brgy. BigaaApril 10, 2025 | 8AM-5PMRight side of Legazpi City-Tiwi Coastal Road going to Tiwi (from Yawa Bridge to Brgy. Bigaa)
March 28, 2025Low pressure to no water and quality concerns due to the interconnection of the new 4″ dia. pipeline at Brgy. CruzadaApril 2, 2025 | 8AM-5PMLeft side of F. Aquende drive going to Albay District
March 21, 2025Low pressure to no water and quality concerns due to technical issues at PhilHydro’s Inc.’s water treatment plantMarch 21, 2025 | Ongoing until further noticeBrgys. 1-41 and 57-59
March 21-22, 2025Bogña Well Field, Mabinit Well Field, and Buyoan Spring Sources Genset OperationMarch 21-22, 2025Brgys. Dita, San Joaquin, Pawa, Bogña, Tamaoyan, Mabinit, Matanag, Buyoan, Arimbay, Bigaa
March 20, 2025Low pressure to no water and quality concerns due to an unscheduled maintenance at Binanuahan Pumping Station)March 20, 2025 | Ongoing until 5PMBrgys. Binanuahan, Buraguis, Puro, and Dap-dap
March 12, 2025Low pressure to no water and quality concerns (emergency repair of distribution line leak at Bliss Site, Brgy. Bagong Abre)March 12, 2025 | 9:30-11:30AMBliss Site, Brgy. Bagong Abre
March 9, 2025Low pressure to no water and quality concerns due to the interconnection of the new 6″ dia. pipeline to the existing 6″ dia. pipeline at Brgy. TamaoyanMarch 11, 2025 | 8AM-5PMTamaoyan Road (from cor. Pawa-Tamaoyan road to Brgy. Capt. Sylvia Del Agua’s residence)
March 6, 2025Emergency repair of distribution line leak at Bliss Bagong AbreMarch 6 2025 | Ongoing until 5PMBliss Bagong Abre
March 3, 2025Low pressure to no water and quality concerns due to technical issues at PhilHydro Inc.’s water treatment plantMarch 3, 2025 | Ongoing until further noticeBrgys. 1-41 and 57-59
February 28, 2025Low pressure to no water and quality concerns (emergency repair of distribution line at Brgys. 27 and 28)February 28. 2025 | Ongoing until 12NNBrgys. 27 and 28
February 24, 2025Low pressure to no water and quality concerns (emergency repair of transmission line at Brgy. Bigaa)February 24, 2025 | Ongoing until 5PMBrgys. Bigaa, Arimbay, and Rawis
February 21, 2025Low pressure to no water and quality concerns due to the low water supply refill of 120 cu.m. cistern tank at Imperial RidgeviewFebruary 21, 2025 | Ongoing until further noticeImperial Ridgeview Subdivision
February 21, 2025Low pressure to no water and quality concerns due to the leak detection activities at Brgy. BuraguisFebruary 21, 2025 | Ongoing until 5PMImperial Ridgeview Subdivision
February 21, 2025Low pressure to no water and quality concerns due to low water flowFebruary 21, 2025 | Ongoing until further noticeBrgys. 1-41 and 57-59
February 12, 2025Emergency repair of transmission line leak at Yawa River (Mabinit Line)February 12, 2025 | Ongoing until further noticeBrgys. Bogtong, Binanuahan East, Binanuahan West, Dap-dap, Puro, and Buraguis
February 10, 2025PhilHydro Inc.’s scheduled maintnenace activity10PM of February 15, 2025 until 3AM of February 16, 2025Brgys. 1-41 and 57-59
February 9, 2025Low pressure to no water and quality concerns due to technical issues at PhilHydro Inc.’s water treatment plantFebruary 9, 2025 | Ongoing until further noticeAlmost all areas of Legazpi City
February 6, 2025Installation of 8″ dia. bypass system in Brgy. 18 – Cabagñan West and Brgy. 1 – EM’s BarrioFebruary 10, 2025 | 8AM-5PM• RIght side going to Legazpi proper (from BU Main Campus to Sagpon Bridge 2)
• Anahaw VIllage
• Right side going to Legazpi Propert (from City Hope Church to Prieto Cargo Forwarders)
• Both sides along Binanuahan Road (from Makabalo bridge to J.P. Rizal Avenue)
January 31, 2025Emergency repair of distribution line leak at Brgy. RawisJanuary 31, 2025 | Ongoing until 9PMP-4 Brgy. Rawis (Coastal Area)
January 28, 2025Low pressure to no water and quality concerns due to the installation of air release valve in the 20HP pump at the Binanuahan Pumping StationJanuary 28, 2025 | Ongoing until 2:30PMPortion of Brgys. Binanauhan and Dap-dap
January 27, 2025Interconnection of 3″ dia. distribution pipeline to the existing 6″ dia. main pipeline along Tahao RoadJanuary 30, 2025 | 8AM-5PMPortion of Brgy. Gogon (along Tahao Road – left side from corner across Redemptorist church to F. Imperial St. intersection)

Portion of Brgy. Bitano (Kabisig and 1st Street, OLV)
Jasnuary 23, 2025Emergency repair of 2″ dia. distirbution line leak at Bagong Pook, RawisJanuary 23, 2025 | Ongoing until 3PMBrgy. Rawis (Bagong Pook)
January 22, 2025Power supply interruption affecting Bogña Well Field’s operationsJanuary 25, 2025 | Ongoing until further noticeBrgys. Bogña, Matanag, Bagong Abre, Buyoan, Pawa, Dita, and Tamaoyan
January 17, 2025Emergency repair of transmission line leak at Yawa RiverJanuary 17, 2025 | Ongoing until further noticeBrgys. Binanuahan, Dap-dap, Buraguis, and Puro
January 15, 2025Repair of 12″ dia. transmission line leak at Brgy. BogtongJanuary 17, 2025 | 8AM-5PMBrgys. 42 (Talisay St., Pag-asa and Oro land Subdivision), 43, 44, 45, and 46
January 14, 2025Emergency repair of transmission line leak at Brgy. BuraguisJanuary 14, 2025 | Ongoing until further noticeBrgys. Buraguis (Seaview Subd., Malindang, and OLV) and Puro
January 13, 2025Suspension of Bogña Wells #4 and #5’s operations due to electrical fuse tripJanuary 13, 2025 | Ongoing until further noticeBrgys. Matanag, Bagong Abre, and Buyoan
January 9, 2025Taysan Pumping Station’s genset operation scheduleJanuary 9, 2025 | 10AM-12NN (downtime)
12NN-8PM (genset operation)
Brgy. Taysan
January 8, 2025Replacement of 4″ dia. gate valve at Ramon Santos St., Brgy. 34January 10, 2025 | 8AM-5PMBrgys. 26, 25, 31, 33, and 34
January 7, 2025Temporary suspension of Binanuahan Pumping Station’s operation due to the emergency replacement of the 20HP pumpJanuary 7, 2025 | Ongoing until 5PMBrgys. Binanuahan, Buraguis, Puro, and Dap-dap
January 6, 2025Temporary suspension of Binanuahan Pumping Station’s operations due to the emergency maintenance of the 20HP pump and motorJanuary 6, 2025 | Ongoing until 5PMBrgys. Binanuahan, Buraguis, Puro, and Dap-dap
January 3, 2025Emergency repair of transmission line hub at Bogña Well #5January 3, 2025 | Ongoing until 3PMBrgys. Matanag, Buyoan, Bagong Abre
December 25, 2024Emergency repair of distribution line leak at Bliss Site, Brgy. Bagong AbreDecember 25, 2024 | Ongoing until 6PMBliss Site, Brgy. Bagong Abre
December 19, 2024Possible low pressure due to the power interruption at PhilHydro’s water treatment plantDecember 19, 2024 | Ongoing until power supply is restoredBrgys. 1-41 and 57-59
December 16, 2024Low pressure to no water and quality concerns due to the emergency repair of distribution line leak at Brgy. Bagong AbreDecember 16, 2024 | From 10PM until further noticeBrgy. Bagong Abre (Bliss)
November 22, 2024Emergency repair of distribution line leak at Brgy. Gogon affected by the ongoing line canal construction project of DPWHNovember 22, 2024 | Ongoing until 12NNP-5 Brgy. Gogon
November 21, 2024Emergency repair of blow-offs at Renaissance Garden, Washington DriveNovember 21, 2024 | 2-4PMRenaissance Garden
November 21, 2024Water supply interruption due to the installation of the booster pump at PhilHydro’s water treatment plant8PM of November 23 to 2AM of November 24Brgys. 1-41 and 57-59
November 19, 2024Low pressure to no water and quality concerns due to the unscheduled maintenance of 2″ dia. distribution line at Victory Village affected by line canal constructionNovember 19, 2024 | 9:30AM-12NNBrgy. 27
November 17, 2024Bogña and Mabinit Well generator set operationNovember 17, 2024 | Ongoing until electricity is restoredBrgys. Bogña, Mabinit, Matanag, Buyuan, Bagong Abre, Pawa, Dita, Tamaoyan, and San Joaquin
November 13, 2024Low pressure to no water and quality concerns due to the maintenance of the 50 HP pump’s control panel at the Binanuahan pumping stationNovember 13, 2024 | Ongoing until 5PMBrgy. Puro and portion of Brgy. Buraguis (OLV, Seaview Subd., Malindang)
November 11, 2024Low pressure to no water and quality concerns due to the maintenance activities at PhilHydro’s water treatment plant6PM of November 13 until 6AM of November 14Brgys. 1-41 and 57-59
November 11, 2024Low pressure to no water and quality concerns due to the transmission line leak at Brgy. BogtongNovember 11, 2024 | Duration TBDBrgys. 1-41 and 57-59
November 7, 2024Low pressure to no water due to low clear water tank level of PhilHydro’s clarifierNovember 7, 2024 | Ongoing until further noticeAlmost all areas of Legazpi
November 6, 2024Low pressure to no water due to the suspected leak on the Mabinit transmission lineNovember 6, 2024 | Ongoing until further noticeBrgys. Buraguis, Dapdap, Puro, Binanuahan, and portion of Victory Village
November 6, 2024Low pressure to no water and quality concerns due to the critical water level of the 120 cu.m. cistern tankNovember 6, 2024 | Ongoing until normal water level has been reachedBrgys. Dapdap, Victory Village, Imperial Ridgeview
November 5, 2024Emergency repair of 6″ dia. distribution line leak at Brgy. TamaoyanNovember 5, 2024 | Ongoing until 5PMBrgys. Tamaoyan and Rawis
November 5, 2024Low pressure to no water and quality concernsNovember 7, 2024 | 8AM-5PMPortion of Brgy. Arimbay (Arimbay barangay road going to P-5 from corner of Legazpi-Tiwi coastal road)
November 3, 2024Low pressure to no water due to the desilting of the Yawa source chamberNovember 3, 2024 | Ongoing until further noticeAlmost all areas of Legazpi
October 31, 2024Low pressure to no water and quality concerns due to the emergency shutdown of PhilHydro’s pumpOctober 31, 2024 | Ongoing until further noticeAlmost all areas of Legazpi
October 30, 2024Low pressure to no water and quality concerns due to the emergency shutdown of PhilHydro’s cistern pumpOctober 30, 2024 | Ongoing until further noticeAlmost all areas of Legazpi
October 29, 2024Low pressure to no water and quality concerns due to NGCP’s power interruption at PhilHydroOctober 29, 2024 | Ongoing until 6PMAlmost all areas of Legazpi
October 29, 2024Adjusted schedule of water supply augmentation of lorry truck at Brgy. Taysan:
5AM – Ibalong VIllage
1PM – Centro Taysan
October 29, 2024Brgy. Taysan
October 26, 2024Adjusted schedule of operations of the Mabinit source:
5AM-9AM
5PM-9PM
October 27, 2024Brgy. Mabinit
October 25, 2024Mabinit line closure due to leakageOctober 25, 2024Brgys. Binanuahan, Buraguis, Puro, Dap-dap, and Victory Village
October 25, 2024Maintenance of Mabinit Well’s generator set and its operationsOctober 25, 2024Brgy. Mabinit
October 22, 2024Suspension of operations of Binanuahan in-line pumping station due to floodingOctober 22, 2024 | Ongoing until further noticeBrgys. Binanuahan, Victory Village, Dap-dap, Puro, and Buraguis
October 22, 2024Low pressure to no water and quality concerns due to the power supply interruption at Brgy. MabinitOctober 22, 2024 | Ongoing until further noticeBrgy. Mabinit
October 22, 2024Quality concerns due to technical issues at PhilHydro’s filtration systemOctober 22, 2024 | Ongoing until further noticeAlmost all areas of Legazpi
October 22, 2024Suspension of augmentation of water supply thru lorry at Brgy. TaysanOctober 22, 2024 | Ongoing until further noticeBrgy. Taysan
October 21, 2024Emergency repair of distribution line leak at Brgy. RawisOctober 21, 2024 | 1-3PMP-2, P-3, and P-4 of Brgy. Rawis
October 18, 2024Low pressure to no water and quality concerns due to the slow water supply recharge of Binanuahan cistern tankOctober 18, 2024 | Ongoing until normal water supply is restoredBrgys. Dap-dap, Binanuahan, and portion of Victory Village
October 15, 2024Interconnection of existing 8″ dia, main pipeline to the 4″ dia. service connection of Ri-Ranch Corporation at Marquez St. – Brgy. 15 Ilawod EastOctober 17, 2024 | 8AM-5PMBrgys. 9-15
October 13, 2024Emergency shutdown of PhilHydro’s booster pump due to high temperatureOctober 13, 2024 | Ongoing until further noticeAlmost all areas of Legazpi City
October 10, 2024Low pressure to no water and quality concerns due to the sudden power interruption at PhilHydro’s water treatment plantOctober 10, 2024 | Ongoing until further noticeAlmost all areas of Legazpi City
October 10, 2024Unscheduled maintenance of 2″ dia. distribution line at Gogon bypass road affected by line canal constructionOctober 10, 2024 | 2-4PMP-5 Brgy. Gogon
October 9, 2024Emergency repair of leakage at Brgy. Rawis (near Gallera), affected by DPWH’s ongoing road constructionOctober 9, 2024 | 2-5PMBrgys. Rawis, ARimbay, and Bigaa
October 8, 2024Emergency repair of 8″ dia. transmission line leak at Brgy. RawisOctober 8, 2024 | 1:30-5PMBrgys. Arimbay, Rawis, and Bonot
October 5, 2024Transmission line leak repair at Brgy. ArimbayOctober 5, 2024 | Ongoing until 5PMBrgys. Rawis, Arimbay, and Bigaa
October 5, 2024Emergency repair of damaged pump at Binanuahan Pumping StationOctober 5, 2024 | Ongoing until 3PMBrgys. Binanuahan, Dap-dap, Buraguis, Puro, portion of Victory Village
October 4, 2024Low pressure to no water due to the critical water level of the Bigaa cistern tankOctober 4, 2024 | Ongoing until further noticeOroland Subdivision, Ecoville Subdivision, P-5 Brgy. Rawis
October 1, 2024Quality concerns and low pressure to no water supply due to a power interruption that will affect Mabinit Well #2’s operationOctober 2, 2024 | 8AM-5PMBrgy. Mabinit
October 1, 2024Low pressure to no water and quality concerns due to the leak repair at San JoaquinOctober 1, 2024Brgys. Dita, San Joaquin, Buyoan, Tamaoyan, Matanag, and P-5 Rawis
October 1, 2024Low pressure to no water and quality concerns due to the interruption at PHI’s water treatment plantOctober 1, 2024Brgy. 1-41 and 57-59
September 27, 2024Low pressure to not water and quality concerns due to the critical water level of the 150 cu.m. cistern tank at Brgy. BuraguisSeptember 27, 2024 | Ongoing until normal water level has been reachedPBN and Seaview Subd., Brgy. Buraguis
September 25, 2024Quality concerns and low pressure to no water supply due to a power interruption that will affect Mabinit Well #2’s operationSeptember 26, 2024 | 8AM-5PMBrgy. Mabinit
September 18, 2024Low pressure and quality concerns due to the transmission line leak at Brgy. BogtongSeptember 18, 2024 | Ongoing until further noticeAlmost all areas of Legazpi City
September 18, 2024Quality concerns and low pressure to no water supply due to a power interruption that will affect Mabinit Well #2’s operationSeptember 19, 2024 | 6AM-6PMBrgy. Mabinit
September 18, 2024Low pressure and quality concerns due to the transmission line leak at Brgy. BogtongSeptember 18, 2024 | Ongoing until further noticeAlmost all areas of Legazpi City
September 16, 2024Distribution line leak repair at Brgy. Rawis affected by road reblockingSeptember 16, 2025 | 2-3PMFrom Gallera to 7/11 Brgy. Rawis
September 13, 2024Quality concerns and low pressure to no water supply due to a power interruption that will affect Mabinit Well #2’s operationSeptember 13, 2024 | Ongoing until 5PMBrgy. Mabinit
September 10, 2024Low pressure to no water and quality concerns due to the critical water level of 120 cu.m. reservoir at Brgy. BuraguisSeptember 10, 2024 | Ongoing until normal water level of reservoir has been reachedBrgys. Dap-dap, Victory Village South, Buraguis
September 9, 2024Unscheduled maintenance of 2″ dia. distribution line at Brgy. Gogon affected by road constructionSeptember 9, 2024 | Ongoing until 2:30 PMBrgy. Gogon
September 2, 2024Low pressure due to critical water level of PhilHydro’s clarified tanksSeptember 2, 2024 | Ongoing until further noticeAlmost all areas of Legazpi City
August 27, 2024Interconnection works of the 5″ dia. uPVC main pipeline extension at Rizal StreetAugust 29, 2024 | 8AM-5PMBrgys. Dap-dap and Victory Village North
August 24, 2024Damaged 2HP pump at Ibalong Village, TaysanAugust 24, 2024 | Ongoing until further noticeBlock 7, Ibalong Village Brgy. Taysan
August 24, 2024Low pressure and quality concerns due to the emergency maintenance of PhilHydro’s water treatment plantAugust 24, 2024 | Ongoing until further noticeAlmost all areas of Legazpi City
August 16, 2024Low pressure to no water due to an unscheduled maintenance of the blow-off at Brgy. RawisAugust 16, 2024 | Ongoing until 2:30PMStarting from the back of Gallera to 7/11 Brgy. Rawis
August 14, 2024Unscheduled maintenance of gate valve at Brgy. Rawis (beside Gallera)August 14, 2024 | 2-3PMFrom Gallera to back of 7/11 Brgy. Rawis
August 13, 2024Unscheduled maintenance of 3″ dia. distribution line at Brgy. RawisAugust 13, 2024 | 2-4PMFrom Gallera to back of 7/11 Brgy. Rawis
August 13, 2024Low pressure to no water and quality concerns due to the continuous depletion of water level of 2,000 cu.m. reservoir at Brgy. BogñaAugust 13, 2024 | TBDBrgys. Pawa, Dita, San Joaquin
August 7, 2024Emergency repair of distribution line leak at Armes Compound, Washington Drive, affected by road worksAugust 7, 2024 | TBDArmes Compound
August 2, 2024Unscheduled maintenance of blow-off at Brgy. RawisAugust 2, 2024 | 1:30-2:30 PMP-2, P-3, P-4 Brgy. Rawis
August 2, 2024Low pressure to no water and quality concerns due to valve setting adjustmentsAugust 2, 2024 | Ongoing until 5PMBrgys. Dap-dap, Buraguis, Puro, and Binanuahan
August 1, 2024Unscheduled maintenance of blow-off at Brgy. RawisAugust 1, 2024 | 10:30-12NNP-3 Brgy. Rawis
July 25, 2024Flushing scheduleJuly 25, 2024 | 8PM onwardsHappy Homes Subdivision, Molave St. – Brgy. Bagumbayan

Vel Amor Subd., Brgy. Cabangan West

Brgy. Bitano

P-2 Brgy. Gogon

Sunrise Subdivision, Sweet Homes, Doña Paz Village, Central City – Brgy. Cruzada
July 25, 2024Quality concerns due to the increase in water pressureJuly 25, 2024Almost all areas of Legazpi City
July 23, 2024Low pressure to no water and quality concern due to power supply interruptionOngoing until power supply is restoredBrgy. Mabinit
July 18, 2024Low pressure and quality concerns due to the transmission line leak at Brgy. BogtongJuly 18, 2024Almost all areas of Legazpi City
July 18, 2024Emergency repair of 2″ dia. distribution line leak at P-2 Brgy. GogonJuly 18, 2024 | 5-9PMP-2 Brgy. Gogon, Central City Subdivision
July 18, 2024Low pressure to no water and quality concerns due to low water level of cistern tanksJuly 18, 2024Imperial Ridgeview Subd., Brgy. Buraguis, Brgy. Puro, Brgy. Dap-dap
July 12, 2024Unscheduled maintenance of 2″ dia. distribution line at Brgy. Bogtong affected by ongoing construction of line canalJuly 12, 2024 | 1:30-3PMP-3 and P-4 Brgy. Bogtong (left side Bogtong road going to Pawa, from Bogtong Elementary School)
July 12, 2024Unclogging of pipelines at P-2 Brgy. GogonJuly 12, 2024 | Ongoing until 5PMP-2 Brgy. Gogon
July 12, 2024Emergency repair of distribution line leak at Camella Homes Subdivision, Brgy. PuroJuly 12, 2024 | Ongoing until 5PMCamella Homes Subd., Brgy. Puro
July 10, 2024Emergency leak repair at Renaissance GardenJuly 10, 2024 | Ongoing until 5PMRenaissance Garden
July 10, 2024Flushing scheduleJuly 10, 2024 | 1PM onwardsCentral City Subd., Barriada, Gogon, Oro Site
July 8, 2024Flushing scheduleJuly 8, 2024 | 8PM onwardsBrgys. 18, 33, 34, 37, 38, 39, 40
July 8, 2024Quality concerns due to the clarifier’s initial testing phaseOngoingBrgys. 1-41 and 57-59
July 4, 2024Emergency repair of Taysan Well #2July 4, 2024 | Ongoing until 8PMBrgy. Taysan
July 2, 2024Quality concerns due to the continuous adjustment of PHI’s water treatment plant operationsJuly 2, 2024Brgys. 1-41 and 57-59
July 1, 2024Non-delivery of water supply to Brgy. Taysan due to the emergency maintenance of LCWD’s lorry truckJuly 1, 2024Brgy. Taysan
July 1, 2024Interconnection of temporarily relocated 8″ dia. main pipeline along Arimbay bridge affected by DPWH bridge widening projectJuly 3, 2024 | 8AM-5PMLeft side going to Tabaco City from UST Legazpi to Bigaa
June 26, 2024Low pressure and quality concerns due to the dry run testing of PhilHydro, Inc.’s clarifierJune 27, 2024 | 8PM onwardsBrgys. 1-41 and 57-59
June 26, 2024Relocation of 2″ dia. water meter of BRHMC affected by the construction of new BRHMC buildingJune 26, 2024 | 1:30-5PMBRHMC and portion of Brgy. Bagtang
June 21, 2024Unscheduled maintenance of distribution line at P-1 Brgy. 24 affected by the ongoing line canal constructionJune 21, 2024 | 9AM-12NNP-1 Brgy. 24
June 20, 2024Low pressure and quality concerns due to the ongoing dry run testing of PhilHydro Inc.’s clarifierJune 20, 2024 | Ongoing until further noticeBrgys. 1-41 and 57-59
June 13, 2024Non-delivery of water supply to Brgy. Taysan due to the emergency maintenance of LCWD’s lorry truckJune 13, 2024 | Today until further noticeBrgy. Taysan
June 13, 2024Unscheduled maintenance of 2″ dia. distribution line at P-5 Brgy. Gogon affected by the ongoing construction of line canalJune 13, 2024 | Ongoing until 12NNP-5 Brgy. Gogon
June 5, 2024Emergency repair of 3″ dia. distribution line leak at Brgy. Bogtong affected by road constructionJune 5, 2024 | Ongoing until 12NNBrgy. Bogtong
June 1, 2024Non-delivery of water supply to Brgy. Taysan due to the emergency maintenance of LCWD’s lorry truckJune 3, 2024Brgy. Taysan
May 31, 2024Unscheduled maintenance of 2″ dia. distribution line at Brgy. Gogon affected by ongoing construction of line canalMay 31, 2024 | 9:30AM-12NNP-5 Brgy. Gogon
May 27, 2024Unscheduled maintenance of 4″ dia. distribution line affected by ongoing construction of line canalMay 27, 2024 | 1:30PM-4PMFrom Children International Legazpi Office to Ace Medical Center
May 23, 2024Low pressure and quality concerns due to NGCP’s emergency power supply interruption at PhilHydro, Inc.’s water treatment plantMay 23, 2024 | Ongoing until normal power supply resumesAlmost all areas of Legazpi
May 23, 2024Emergency repair of distribution line leak in front of DBP Quezon AvenueMay 23, 2024 | Ongoing until 5PMLapu-lapu, Dinagaan, Quezon Avenue
May 17, 2024Unscheduled maintenance of 2″ dia. distribution line at P-5 Brgy. Gogon affected by the ongoing construction of line canalMay 17, 2024 | 9:30AM-12NNP-5 Brgy. Gogon
May 13, 202412-hour plant shutdown of PhilHydro, Inc. (PHI) due to the maintenance works at the water treatment plantMay 15-16, 2024 | 6PM (May 15) – 6PM (May 16)Brgys. 1-41 and 57-59
May 13, 2024Interconnection of temporarily relocated 8″ dia. main pipeline along Arimbay bridge affected by DPWH bridge widening projectMay 15, 2024 | 8AM-5PMBrgys. Rawis, Arimbay, and Bigaa (right side going to Tabaco City from Regional Center Site to Bigaa)
May 10, 2024Unscheduled maintenance of 4″ dia. distribution line at Brgy. Bogtong affected by ongoing construction of line canalMay 10, 2024 | Ongoing until 5PMFrom Children International Legazpi Officer to Ace Medical Center
May 10, 2024Unscheduled maintenance of 2″ dia. distribution line at La Playa, Brgy. Bonot affected by ongoing construction of line canalMay 10, 2024 | Ongoing until 5PMLa Playa Village, Brgy. Bonot
May 7, 2024Unscheduled maintenance of 2″ dia. distribution line at P-5 Brgy. Gogon affected by the ongoing line canal constructionMay 7, 2024 | 1:30-5PMP-5 Brgy. Gogon
May 2, 2024Low pressure and quality concerns due to the disconnected primary line from the primary cut-off at Bogña Well #4May 2, 2024 | Ongoing until further noticeBrgys. Pawa, Dita, San Joaquin, Tamaoyan, Rawis (Oroland)
May 2, 2024Unscheduled maintenance of distribution line at La Playa Village, Brgy. Bonot affected by the ongoing line canal constructionMay 2, 2024 | Ongoing until 3PMLa Playa Village
April 27, 2024Low pressure to no water and quality concerns due to the critical level of cistern tanks and reservoirsApril 27, 2024 | Ongoing until normal water level of cistern tanks and reservoir has been reachedCamella Homes, Imperial Ridgeview, Puro, Buraguis, Dap-dap, Binanuahan
April 26, 2024Low pressure to no water due to the ongoing repair of 5HP pump at PBN Pumping StationApril 26, 2024 | Ongoing until further noticeCamella Homes, Puro, Dap-dap, Binanuahan, Imperial Ridgeview, Buraguis
April 24, 2024Low pressure to no water caused by damaged 5HP pump at Binanuahan Pumping StationApril 24, 2024 | Ongoing until further noticeBrgys. Binanuahan and Dap-dap
April 24, 2024Relocation of 3″ dia. distribution line affected by line canal construction at P-2 Brgy. RawisApril 24, 2024 | Ongoing until 4PMPurok 2-5 Brgy. Rawis
April 24, 2024Relocation of 3″ dia. distribution line affected by ongoing canal constructionApril 24, 2024 | Ongoing until 5PMLa Playa Village and Aeroville Subdivision, Brgy. Bonot
April 23, 2024Emergency repair of 8″ dia. main line leak along YMCA laneApril 23, 2024 | Ongoing until 10PMBrgys. 1-3, portion of brgys. 8, 16, and 40 (left side of Washington Drive from rail road going to Cruzada)
April 23, 2024Distribution line leak repair at Tinago, Bigaa affected by the ongoing construction of line canalApril 23, 2024 | Ongoing until 5PMTinago, Brgy. Bigaa
April 19, 2024Unscheduled maintenance of 3″ dia. distribution line at La Playa Village, Bonot affected by the ongoing line canal construction April 19, 2024 | Ongoing until 5PMLa Playa Village and Aeroville Subdivision, Brgy. Bonot
April 17, 2024Unscheduled relocation of distribution line at Brgy. Rawis affected by the ongoing line canal constructionApril 17, 2024 | 1:30-3PMP-2 to P-5, Brgy. Rawis
April 12, 2024Unscheduled relocation of distribution line at Brgy. Rawis affected by the ongoing line canal constructionApril 12, 2024 | 1:30-4:30PMP-2 to P-5 Brgy. Rawis
April 8, 2024Unscheduled relocation of 2″ dia. distribution line at P-5 Brgy. Gogon affected by the ongoing line canal constructionApril 8, 2024 | 1:30-5PMP-5 Brgy. Gogon
April 3, 2024Low pressure to no water and quality concernsApril 3, 2024 | Ongoing until power supply stabilizesMabinit, Bogña, Buyoan
April 2, 2024Emergency installation of 4″ dia. check valve at Tektone Village April 2, 2024 | Ongoing until 6PMPhases 1 and 2 of Tektone Village
March 21, 2024Emergency relocation of 3″ dia. distribution line near Gallera, Rawis affected by line canal constructionMarch 21, 2024 } 1-5PMP-2, P-3 and residences/ establishments near Gallera, Brgy. Rawis
March 21, 2024Commissioning of pressure control valve at Brgy. 53 Bogña and Brgy. 48 Bagong AbreMarch 21, 2024 | 8AM-5PMAlong Bogña-Dita Road
Along Bagong Abre-Arimbay Barangay Road
March 13, 2024Emergency relocation of distribution line at La Playa Village, Brgy. Bonot affected by the ongoing line canal constructionMarch 13, 2024 | Ongoing until 5PMLa Playa Village and Aeroville Subdivision, Brgy. Bonot
March 6, 2024Emergency repair of distribution line leak at La Playa, Brgy. Bonot affected by the ongoing line canal constructionMarch 6, 2024 | Ongoing until 5PMAeroville Subd. and La Playa Village
March 6, 2024Low pressure to no water and quality concerns due to the transmission line leak repair at PhilHydro Inc.’s water treatment facilityMarch 6, 2024 | Ongoing until further noticeBrgys. 7, 8, 16, 21, 22, 37, 38, 39, 40, 57, 58, 59, and Centro Legazpi
March 6, 2024Emergency relocation of distribution line at Brgy. Rawis affected by the ongoing line canal constructionMarch 6, 2024 | 9:30-11AMP-2 and P-5 Brgy. Rawis
March 4, 2024Low pressure to no water and quality concerns due to the leak at PhilHydro Inc.’s (PHI) transmission lineMarch 4, 2024 | Duration of repair shall be determined after PHI’s assessmentAlmost all areas of Legazpi
March 1, 2024Installation of pressure control valve at Brgy. 53 – BogñaMarch 5, 2024 | 8AM-5PMAlong Bogña-Dita Barangay Road (from blow-off valve near frontline glass and aluminum supply to corner Dita-Pawa road)
February 29, 2024Emergency relocation of 2″ dia. Distribution Line at P-5 Brgy. Gogon affected by the ongoing line canal constructionFebruary 29, 2024 | 1:30-5PMP-5 Brgy. Gogon
February 29, 2024Replacement of Individual Water Meters at Tektone Village, Brgy. Lapu-lapuMarch 1, 2024 | 8AM-5PMTektone Village
February 27, 2024Low pressure to no water and quality concernsFebruary 27, 2024 | Until power supply resumesBrgys. Binanuahan, Puro, Buraguis, and Dap-dap
February 27, 2024Emergency Repair of 3″ dia. Distribution Line Leak at La Playa, Bonot Affected by the Ongoing Construction of Line CanalFebruary 27, 2024 | Ongoing until 11:30 AMAeroville and La Playa, Bonot
February 25, 2024Suspension of Water Rationing at Brgy. Taysan due to the Scheduled Maintenance of LCWD’s Lorry TruckFebruary 27, 2024Brgy. Taysan
February 23, 2024Installation of Pressure Control Valve at Brgy. 48 – Bagong AbreFebruary 27, 2024 | 8AM-5PMAlong Bagong Abre – Arimbay Rd. (from Bagong Abre Chapel to Arimbay Bridge)
February 18, 2024Low pressure to no water and quality concerns due to unstable power supplyFebruary 18, 2024Brgys. Pawa, Dita, San Joaquin, Tamaoyan, Matanag, Bagong Abre, and Bogña
February 14, 2024Interconnection of the existing 2″ distribution pipe to the new 3″ distribution pipe at Our Lady’s Village, BitanoFebruary 16, 2024 | 8AM-5PMOur Lady’s Village, Bitano
February 13, 2024Low pressure to no water and quality concerns due to PhilHydro Inc.’s 6-hour plant shutdown for filter maintenanceFebruary 17-18, 2024Brgys. 1-41 and 57-59
February 8, 2024Emergency relocation of 3″ dia. distribution line at P-7 Brgy. Bigaa affected by the ongoing line canal constructionFebruary 8, 2024 | 1:30-3PMP-7 Brgy. Bigaa
January 29, 2024Installation of new water service connection for GSIS LegazpiJanuary 31, 2024 | 8AM-5PMLeft side of Alternate Road (from Washington Drive to Traffic Light)
January 19, 2024Emergency repair of distribution line at P-7 Brgy. BigaaJanuary 19, 2024 | 1:30-2:30PMP-7 Brgy. Bigaa
January 17, 2024Emergency repair of 8″ dia. main line leak at Brgy. ArimbayJanuary 17, 2024 | 1-5PMBrgy. Arimbay and Brgy. Rawis
January 16, 2024Emergency repair of distribution line leak at P-7 Brgy. Bigaa affected by line canal constructionJanuary 16, 2024 | Ongoing until 3PMP-7 Brgy. Bigaa
January 16, 2024Emergency repair of distribution line leak at Brgy. Binanuahan EastJanuary 16, 2024 | Ongoing until 3PMRight side from Binanuahan Road to boundary of Brgy. Binanuahan East and Brgy. Dap-dap
January 16, 2024Emergency repair of distribution line leak at P-7 Brgy. Bigaa affected by line canal constructionJanuary 16, 2024 | Ongoing until 3PMP-7 Brgy. Bigaa
January 16, 2024Emergency repair of distribution line leak at Brgy. Binanuahan EastJanuary 16, 2024 | Ongoing until 3PMRight side from Binanuahan Road to boundary of Brgy. Binanuahan East and Brgy. Dap-dap
January 12, 2024Emergency relocation of 2″ dia. distribution line at Brgy. Gogon affected by line canal constructionJanuary 12, 2024 | 1:30-5PMP-5 Brgy. Gogon
January 9, 2024Emergency repair of distribution line leak at La Playa Village, Brgy. Bonot affected by line canal constructionJanuary 9, 2024 | Ongoing until 5PMLa Playa Village, Brgy. Bonot
January 4, 2024Low pressure and quality concerns due to the emergency replacement of saddle clamp with tee reducer along Imelda Roces AvenueJanuary 4, 2024 | 8AM-5PMleft side of Imelda Roces Avenue (from traffic light to Marison Hotel)
January 3, 2024Emergency repair of 8″ dia. main line leak along Alternate Road, Brgy. 16January 4, 2024 | 8AM-5PMAlternate Road
December 29, 2023Abandon 2″ pipeline affected by road wideningDecember 29, 2023 | Ongoing until 5PMBrgys. Bigaa, Arimbay, and Rawis
December 20, 2023Emergency relocation of 2″ dia. distribution line at Lapu-lapu affected by line canal constructionDecember 20, 2023 | 1:30-3PMBrgy. Lapu-lapu, Brgy. 27 and Brgy. 28
December 20, 2023Emergency repair of 8″ dia. main line leak along Rizal StreetDecember 20, 2023 | 9AM-5PMFrom Sagpon bridge to boundary of Legazpi and Daraga (right side going to Daraga), Camp Simeon Ola, BRTTH and Bagtang
December 18, 2023Emergency repair of 2″ dia. distribution line leak affected by line canal construction at 5thDecember 18, 2023 | 2-4:30PM5th St. OLV, Bitano
December 14, 2023Emergency repair of 2″ dia. distribution line leak affected by line canal construction at 5th St. OLV, BitanoDecember 14, 2023 | Ongoing until 5PM5th St. OLV, Bitano
December 14, 2023Emergency relocation of distribution line affected by line canal construction at P-4 RawisDecember 14, 2023 | Ongoing until 5PMGallera and Residences/ establishments at the back of 7/11
December 13, 2023Emergency reinstallation of the 3″ dia. distribution line affected by a TelCo’s drilling activity at Brgy. RawisDecember 13, 2023 | Ongoing until 6PMRegional Center Site and Bagoong Pook, Rawis
December 8, 2023Low pressure to no water and quality concerns due to PhilHydro Inc.’s emergency transmission line leak repairDecember 8, 2023 | Duration TBD after assessmentAlmost all areas of Legazpi City
December 7, 2023Emergency leak repair at Brgy. PawaDecember 7, 2023 | Duration TBD after assessmentBrgys. Tamaoyan, Dita, San Joaquin, and P-5 Rawis
December 6, 2023Emergency relocation of 2″ dia. Distribution Line at 5th St. OLV, Brgy. Bitano affected by line canal constructionDecember 6, 2023 | 1:30-5PM5th St. OLV, Brgy. Bitano
December 5, 2023Emergency relocation of 4″ dia. Distribution Line at City Heights Subdivision, Brgy. Rawis affected by ongoing line canal constructionDecember 5, 2023 | Ongoing until 5PMCity Heights Subdivision and Talisay St., Brgy. Rawis
December 4, 2023Emergency relocation of 2″ dia. Distribution Line at 5th St. Our Lady’s Village, Brgy. Bitano affected by the construction of line canalDecember 4, 2023 | Ongoing until 5PM5th St. OLV, Brgy. Bitano
December 1, 2023Installation of New Connection of Albay Park and WildlifeDecember 5, 2023 | 8AM-5PMRight side of Daraga-Legazpi Diversion Road, Brgy. Bogtong (from Sagrada Familia to ACE Medical Center to 5th Forward Service Support Unit, Army Support Command, Philippine Army)
November 30, 2023Emergency deepening of distribution line at Imperial Ridgeview SubdivisionNovember 30, 2023 | Ongoing until 12NNPortion of Imperial Ridgeview Subdivision
November 29, 2023Emergency relocation of 3″ Distribution Line at P-4 Rawis affected by the ongoing construction of line canalNovember 29, 2023 | 2:30-5PMP-2 and P-4 Brgy. Rawis
November 29, 2023Replacement of Yashano Mall’s flow meterDecember 1, 2023 | 8AM-5PMBrgy. Capantawan – from Terminal Road 1 (in front of Legazpi City Science High School and Yashano Mall) to IBP Road (CSC Albay Field Office)
November 28, 2023Emergency relocation of 3″ Distribution Line at P-4 Rawis affected by the ongoing line canal constructionNovember 28, 2023 | Ongoing until 5PMP-2 and P-4 Brgy. Rawis
November 24, 2023Emergency repair of 8″ dia. PVC Pipe Leak at Brgy. Arimbay (in front of NEDA) affected by ongoing road constructionNovember 24, 2023 | Ongoing until 9PMPortion of Brgy. Rawis, Arimbay, and Bigaa (right side going to Tabaco)
November 23, 2023Emergency repair of main line leak at Brgy. Bogña affected by ongoing road constructionNovember 23, 2023 | Ongoing until 6PMBrgy. Bogña and portion of Brgy. Dita
November 16, 2023Emergency Relocation of Distribution Line near Gallera, Rawis affected by the Construction of Line CanalNovember 16, 2023 | 2-5PMP-2 Brgy. Rawis
November 14, 2023Emergency relocation of distribution line at City Heights, Rawis affected by the construction of line canalNovember 14, 2023 | Ongoing until 3PMCity Heights Subdivision Talisay St., Pag-asa, Rawis
November 14, 2023Emergency repair of 4″ distribution line leak at Brgy. BogñaNovember 14, 2023 | Ongoing until 9PMP-7 Brgy. Bogña and P-1 and P-2 Brgy. Dita (upper portion of Bogña may also experience low pressure)
November 13, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyNovember 13, 2023Almost all areas in Legazpi City
November 13, 2023Installation of new 3″ dia. water service connection of DPWH 2nd District Engineering OfficeNovember 15, 2023 | 8-5PMPortion of Brgy. Cruzada and Brgy. 3 EM’s Barrio
November 13, 2023Postponement of water rationing at Brgy. TaysanNovember 13, 2023Brgy. Taysan
November 9, 2023Low pressure to no water and quality concern due to PHI’s regulation of water supplyNovember 9, 2023Almost all areas in Legazpi City
November 7, 2023Suspension of water rationing at Brgy. TaysanNovember 7, 2023Brgy. Taysan
November 3, 2023Emergency relocation and replacement of 2″ dia. distribution line at Brgy. Gogon affected by line canal constructionNovember 3, 2023 | 1:30-5PMP-5 Brgy. Gogon
October 25, 2023Interconnection of the new 3″ distribution pipeline to the existing 6″ transmission pipelineOctober 25, 2023 | 8-5PMBarriada, OLV, Sol’s Subdivision and portion of Bitano
October 17, 2023Emergency relocation of distribution line at Brgy. Rawis affected by the construction of line canalOctober 17, 2023 | Ongoing until 4PMP-2 Brgy. Rawis and establishments near Gallera
October 16, 2023Emergency repair of distribution line leak at Brgy. BagumbayanOctober 16, 2023 | 1-5PMWest Washington Drive to BUCIT Road
October 15, 2023Emergency repair of main line leak at Brgy. BogñaOctober 15, 2023 | Ongoing until 5PMBrgy. Matanag, Bagong Abre, Buyoan, and portion of Bogña (near boundary)
October 9, 2023Relocation of 8″ dia. gate valve affected by DPWH widening at Arimbay bridgeOctober 10, 2023 | 8-5PMBrgy. Rawis, Arimbay, and Bigaa (right side going to Tabaco)
October 5, 2023Emergency repair and relocation of 2″ dia. distribution line at P-5 Gogon affected by line canal constructionOctober 5, 2023 | Ongoing until 12NNP-5 Brgy. Gogon
October 4, 2023Emergency repair and relocation of 2″ dia. distribution line at Gogon affected by line canal constructionOctober 4, 2023P-5 Gogon
October 4, 2023Low pressure to no water and quality concerns due to low water level of the cistern tank at BinanuahanOctober 4, 2023Buraguis, Malindang, Puro, and portion of Ridgeview
September 28, 2023Emergency relocation of 3″ dia. distribution line at San Jose St., Rawis affected by ongoing construction of drainage canalSeptember 28, 2023 | 2-5PMFrom Gallera to 7/11 Rawis
September 26, 2023Emergency replacement of Binanuahan cistern tank’s gate valveSeptember 26, 2023 | Ongoing until 9:30AMCamella Homes, Puro, Buraguis, and portion of Imperial Ridgeview Subdivision
September 23, 2023Low pressure to no water and quality concerns due to the critical water level at the 150 cu.m. cistern tank at Brgy. BuraguisSeptember 23, 2023Camella Homes, Imperial Ridgeview, Brgy. Buraguis, and Brgy. Puro
September 21, 2023Low pressure to no water and quality concerns due to the emergency repair of the transmission line leak at Brgy. Bogton (in front of ACE Medical Center)September 21, 2023Almost all areas of Legazpi City
September 20, 2023Emergency repair of distribution line leak at Brgy. BogtongSeptember 20, 2023From Children’s International office to MDS Carwash
September 16, 2023Low pressure to no water and quality concerns due to the critical water level of the 2,000 cu.m. cistern tank at Brgy. BinanuahanSeptember 16, 2023Camella Homes, Brgy. Puro and Brgy. Buraguis
September 11, 2023Relocation of 2″ dia. distribution line at Brgy. Gogon affected by ongoing line canal constructionSeptember 11, 2023 | 1:30-5PMP-5 Gogon
September 8, 2023Low pressure to no water and quality concerns due to the emergency maintenance of the electrical system of LCWD’s well at Brgy. Bogña (Bogña Well #4)September 8, 2023Pawa, Dita, San Joaquin, Tamaoyan, and Oro Land, Rawis
September 6, 2023Low pressure and quality concerns due to PHI’s maintenance activitySeptember 8, 2023 | 5-3PMBrgy. 1-41 and 57-59
September 6, 2023Emergency relocation of distribution line at Tanawan, Bigaa affected by the bridge constructionSeptember 6, 2023 | Ongoing until 6PMTanawan, Bigaa
September 6, 2023Relocation of 3″ dia. distribution line at Brgy. Oro site affected by construction of line canalSeptember 6, 2023 | 1-5PMBrgy. Oro site and portion of Bitano
September 5, 2023Low pressure and quality concernsSeptember 6, 2023 | 8-5PMBigaa, Buyoan, Bogña, Matanag, Arimbay, Rawis, Bagong Abre, Dita, San Joaquin, Tamaoyan, and Pawa
September 5, 2023Emergency relocation of distribution line at P-5 Gogon affected by line canal constructionSeptember 5, 2023 | 1:30-5PMP-5 Gogon
September 4, 2023Low pressure and quality problem due to flushing activitiesSeptember 4, 2023Dap-dap, Victory Village, and portion of Binanuahan
September 4, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplySeptember 4, 2023Almost all areas of Legazpi City
August 31, 2023Emergency repair of main line leak at Brgy. PuroAugust 31, 2023 | 5PMCamella Homes Subdivision
August 25, 2023Emergency repair of 150 cu.m. cistern tank’s refill pipe at Brgy. BuraguisAugust 25, 2023Brgy. Buraguis and portion of Imperial Ridgeview Subdivision
August 25, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyAugust 25, 2023Almost all areas in Legazpi City
August 24, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyAugust 24, 2023Almost all areas in Legazpi City
August 24, 2023Low pressure and quality concerns due to the emergency maintenance of the electric system of Bogña Wells 4 and 5August 24, 2023Brgy. Tamaoyan, Dita, Pawa, San Joaquin, and Oroland, Rawis
August 23, 2023Interconnection of 2″ dia. distribution pipeline to 8″ main pipeline along Imelda Roces Ave. and repair of mainline leak near La Roca Veranda SuitesAugust 24, 2023 | 8-5PMPortion of Brgy. Gogon and Cruzada (back of Marison Hotel to La Piazza and from Marison Hotel to Gogon Barangay Hall)
August 22, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyAugust 22, 2023Almost all areas of Legazpi
August 21, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyAugust 21, 2023Almost all areas of Legazpi
August 20, 2023Low pressure to no water and quality concerns due to the critical water level of the 120 cu.m. cistern tank at Imperial Ridgeview SubdivisionAugust 20, 2023Imperial Ridgeview Subdivision and Brgy. Dap-dap
August 18, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyAugust 18, 2023Almost all areas in Legazpi City
August 17, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyAugust 17, 2023Almost all areas of Legazpi City
August 16, 2023Emergency replacement of gate valve at Bliss, Bagong AbreAugust 16, 2023 | Ongoing until 4PMFrom Bliss to Bagong Abre Chapel
August 15, 2023PHI’s 5-hour plant shutdown for the tapping of filter row to production lineAugust 15-16, 2023 | 10PM-3AMBrgy. 1-41 and 57-59
August 15, 2023Emergency relocation of blow-off at Brgy. 15 affected by the construction of riprapAugust 15, 2023 | 1:30-5PMBrgy. 15
August 15, 2023Low pressure and quality concernsAugust 15, 2023All areas in Legazpi City
August 9, 2023Emergency relocation of 4″ dia. distribution line at Legazpi City Heights Subdivision, Brgy. Rawis affected by ongoing construction of drainage canalAugust 9, 2023 | 1:30-4PMLegazpi City Heights Subdivision
August 9, 2023Emergency repair of 2″ dia. distribution line leak at Brgy. Gogon affected by ongoing line canal constructionAugust 9, 2023 | Ongoing until 12NNP-5 Brgy. Gogon
August 8, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyAugust 8, 2023Almost all areas in Legazpi City
August 7, 2023Emergency leak repair of 2″ dia. distribution line at Barriada affected by ongoing line canal constructionAugust 7, 2023 | Ongoing until 5PMBarriada
July 31, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyJuly 31, 2023Almost all areas in Legazpi City
July 25, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyJuly 25, 2023Almost all areas in Legazpi City
July 18, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyJuly 18, 2023Almost all areas in Legazpi City
July 12, 2023Emergency relocation of 2″ dia. distribution line at Oro Site affected by line canal constructionJuly 12, 2023 | ongoing until 5PMOro Site
July 12, 2023Low pressure to no water and quality concern due to low water level of the 150 cu.m. reservoir at BuraguisJuly 12, 2023 | ongoing until further noticeBrgys. Buraguis, Malindang, and Puro
July 10, 2023Maintenance of pump and motor of Taysan Well No. 2July 11-13, 2023 | 8AM-5PMIbalong Village and Tognao, Brgy. Taysan
July 10, 2023Low pressure to no water and quality concerns due to valve adjustments for Mabinit line utilizationJuly 10-11, 2023 | 3PM-5AMBogtong Diversion Road (from Bicol Memorial Park to corner of Sagrada Familia)
July 10, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyJuly 10, 2023 | ongoing until normal supply resumesAlmost all areas in Legazpi City
July 9, 2023Emergency repair of main line leak along Imelda Roces AvenueJuly 9, 2023 | ongoing until further noticeOur Lady’s Village, Central City, Barriada, Bitano, and Capantawan
July 9, 2023Low pressure to no water and quality concernsJuly 9, 2023 | 1-8PMBrgys. Buraguis and Dap-dap
July 8, 2023Low pressure to no water and quality concerns due to the critical water level of the 120 cu.m. cistern tank at Imperial Ridgeview SubdivisionJuly 8, 2023 | ongoing until further noticeImperial Ridgeview Subdivision
July 8, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyJuly 8, 2023 | ongoing until further noticeAlmost all areas in Legazpi City
July 7, 2023Emergency excavation and installation of 3″ dia. uPVC pipe at Brgy. Bogña affected by ongoing road constructionJuly 7, 2023 | ongoing until 5PMBrgy. Bogña
July 6, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyJuly 6, 2023 | until normal supply resumesAlmost all areas in Legazpi City
July 4, 2023Interconnection of 4″ dia. supply pipe from 2,000 cu.m. ground reservoir to the existing distribution pipelineJuly 6, 2023 | 8AM-5PMBrgys. San Joaquin, Dita, and portion of Bogña
July 3, 2023Emergency elevation of 2″ dia. distribution line at Brgy. Bogtong affected by ongoing drainage constructionJuly 3, 2023 | 2-5PMBrgy. Bogtong
July 3, 2023Interconnection of 3″ and 2″ dia. distribution pipelines at Brgy. Dap-dapJuly 3, 2023 | 8AM-5PMBrgys. Dap-dap, Victory Village (north and south), and Imperial Ridgeview Subdivision
July 1, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyJuly 1, 2023 | ongoing until further noticeAlmost all areas in Legazpi City
June 29, 2023Emergency repair of 8″ dia. uPVC pipe damaged by backhoe at Brgy. Bigaa (near St. Vincent Ferrer Parish)June 29, 2023 | ongoing until further noticeResidences and establishments located at the left side going to Arimbay
June 28, 2023Low pressure to no water and quality concerns due to PHI’s regulation of water supplyJune 28, 2023 | ongoing until further noticeAlmost all areas in Legazpi City
June 27, 2023Low pressure to no water and quality concern due to high turbidity of raw water from Yawa River and Low Yield from Pawa RiverJune 27, 2023 | until normal supply resumesAlmost all areas in Legazpi City
June 27, 2023Low pressure to no waterJune 27, 2023 | ongoing until further noticeBrgys. Bogña, Matanag, Bagong Abre, Buyoan, and portion of Dita
June 23, 2023Emergency repair of distribution line leak at Brgy. Cruzada, corner F. Aquende Drive and Airport RoadJune 23, 2023 | ongoing until 5PMAirport Site
June 23, 2023Low pressure to no water and quality concern due to high turbidity of raw water from Yawa River and Low Yield from Pawa RiverJune 23, 2023 | until normal supply resumesAlmost all areas in Legazpi City
June 21, 2023Low pressure to no water and quality concern due to high turbidity of raw water from Yawa River and Low Yield from Pawa RiverJune 21, 2023 | until normal supply resumesAlmost all areas in Legazpi City
June 20, 2023Emergency relocation of 4″ uPVC pipe affected by ongoing Line Canal Construction at Brgy. MatanagJune 20, 2023 | ongoing until 4PMBrgys. Matanag, Buyoan, and Bagong Abre
June 16, 2023Emergency relocation of distribution line at City Heights Subd., Rawis affected by Line Canal ConstructionJune 16, 2023 | ongoing until 4PMCity Heights Subd., Rawis
June 15. 2023Low pressure to no water and quality concern due to high turbidity of raw water from Yawa River and low yield from Pawa RiverJune 15, 2023 | until normal supply resumesAlmost all areas in Legazpi City
June 14, 2023Emergency repair of 2″ distribution line leak along 5th St. OLV, BitanoJune 14, 2023 | ongoing until 5PM5th St. OLV, Bitano
June 13, 2023Emergency repair of distribution line leak at P-3 BuraguisJune 13, 2023 | ongoing until 5PMMalindang, P-3, and P-5, Buraguis
June 12, 2023Low pressure to no water and quality concerns due to PhilHydro’s water supply regulationJune 12, 2023 | until normal supply resumesAlmost all areas in Legazpi City
June 8, 2023Damaged/ leaking 16″ transmission line of PhilHydro Inc.June 8, 2023Brgys. 1-41 and 57-59
June 7, 2023Low pressure and quality concernJune 8, 2023 | 7AM-5PMAlmost all areas in Legazpi City

June 5, 2023
Emergency repair of 8″ main line leak at Brgy. Bigaa affected by the ongoing drilling of a telecommunications companyJune 5, 2023 | ongoing until 10PMBrgys. Rawis, Arimbay, and Bigaa
May 28, 2023Water interruption due to abnormal pumping operations at Mabinit and Binanuahan Pumping Stations caused by low voltage supplyMay 27-28, 2023Brgys. Buraguis and Puro
May 26, 2023Low Pressure to No Water and Quality Concern due to PhilHydro’s water supply regulationMay 26, 2023 | ongoing until normal water supply resumesAlmost all areas in Legazpi City
May 25, 2023No water due to emergency water rationing at Tognao, TaysanMay 25, 2023 | 4-6PMIbalong Village, Taysan
May 25, 2023Low Pressure to No Water and Quality Concern due to Low Water Level of the 2,000 cu.m. Reservoir at Brgy. BogñaMay 25, 2023 | Ongoing until water level increasesBrgys. Pawa, Dita, San Joaquin, Tamoyan, and Rawis (Oro Land and Pag-asa)
May 24, 2023Emergency Relocation of 2″ Distribution Line at Brgy. Oro Site affected by ongoing Line Canal ConstructionMay 24, 2023 | 1:30-5PMBrgys. Oro Site and portion of Bitano
May 23, 2023Emergency Relocation 2″ & 3″ Distribution Line affected by Line Canal Construction at Oro SiteMay 23, 2023 | 1:30-5PMOro Site (welcome arch) going Quezon Ave. Extension (northbound) to Oro Site High School until Oro Site Brgy. Hall
May 19, 2023Emergency Cleaning of 2,000 cu.m. Reservoir at Brgy. BogñaMay 19, 2023 | ongoing until 7PMBrgys. Pawa, Dita, San Joaquin, Tamaoyan, and Rawis (Oro Land and Pag-asa)
May 18, 2023Emergency Interconnection of Main Pipeline from Bogña Pumping StationMay 19-20, 2023 | 3PM-5PMBrgys. Pawa, Dita, San Joaquin, and upper portion of Rawis
May 18, 2023Installation of New Service Connection of Makapa Land at Doña Aurora StreetMay 18, 2023 | 9AM to 12NNBalintawak Street residences and establishments near DOLE and Albay Central School
May 17, 2023Installation of 12″ D.I. Gate Valve along Binanuahan Road, Brgy. Binanuahan WestMay 19, 2023 | 8AM to 8PMBrgys. Puro, Buraguis, portion of Dap-dap, Binanuahan West, and portion of Victory Village
May 17, 2023Emergency Relocation of 3″ Distribution Line at Diego Silang Street affected by Line Canal ConstructionMay 17, 2023 | 1:30PM to 5PMBrgys. 13, 14, and 15
May 16, 2023Emergency Relocation of 3″ Distribution Line at Diego Silang Street Legazpi CIty affected by ongoing Line Canal ConstructionMay 16, 2023 | 1:30PM-5PMBrgys. 13, 14, 15, Maoyod, and Tula-tula
May 12, 2023Emergency Repair of 2,000 cu.m. Cistern Tank’s 6″ dia. Refill Pipe at Brgy. BuraguisMay 12, 2023 | Ongoing until 7PMBrgys. Puro and Buraguis
May 12, 2023Emergency Repair of 8″ Main Line Leak along Rizal StreetMay 12, 2023 | Ongoing until 8PMFrom BU Main Campus to Sagpon Bridge 2 (right side of Rizal Street going to Old Albay)
May 11, 2023Emergency Relocation of 4″ Distribution Line at Legazpi Heights Subd., Rawis affected by ongoing Line Canal ConstructionMay 11, 2023 | 2PM-5PMLegazpi Heights Subd., Brgy. Rawis
May 11, 2023Emergency Repositioning of Distribution Line at Diego Silang St., Tula-tula affected by ongoing Line Canal ConstructionMay 11, 2023 | Ongoing until 8PMBrgys. 12, 13, 14, and 15
May 9, 2023Installation of 12″ D.I. Gate Valve along Riverside St., Brgy. BogtongMay 11-12, 2023 | 8AM-8PMBrgy. Bogtong
May 3, 2023Low pressure to no water and quality concerns due to heavy rainMay 3, 2023Almost all areas in Legazpi City
May 2, 2023Repair and replacement of electrical components on their transmission poles (PhilHydro activity) – may cause low pressure and quality problemMay 3, 2023 | 7AM-5:15PMAlmost all areas in Legazpi City
April 28, 2023Emergency relocation of distribution line at Brgy. Oro Site affected by ongoing line canal constructionApril 28, 2023 | 1:30-5PMBrgy. Oro Site
April 26, 2023Emergency relocation of distribution line at Diego Silang St. affected by ongoing line canal constructionApril 26, 2023 | Ongoing until 12PMBrgys. 13-15
April 19, 2023Emergency relocation of distribution line at Marquez St. affected by ongoing line canal constructionApril 19, 2023 | 1:30-5PMBrgys. 13-15
April 14, 2023Emergency replacement of mechanical tee reducer at Marquez St. affected by ongoing line canal constructionApril 14, 2023 | 1:30-5PMBrgys. 13-15
April 13, 2023Emergency repair of distribution line at Brgy. Buyoan affected by ongoing construction of line canalApril 13, 2023 | Ongoing until 5PMBrgy. Buyoan
April 13, 2023Emergency relocation of distribution line at Marquez St. affected by ongoing construction of line canalApril 13, 2023 | Ongoing until 5PMBrgys. 13-15
April 12, 2023Low pressure to no water and quality concerns due to regulation of water supply by PhilHydroApril 12, 2023 | until normal water supply from PhilHydro resumesAlmost all areas of Legazpi City
March 31, 2023Emergency installation of gate valve at Brgy. TamaoyanMarch 31, 2023 | 9:30AM-3PMBrgy. Tamaoyan, Oro Land, Rawis, and nearby residences
March 29, 2023Emergency relocation of 3″ dia. uPVC pipe at Marquez St. affected by ongoing line canal constructionMarch 29, 2023 | 9AM-12NNBrgys. 13-15
Mrach 28, 2023Emergency relocation of 4″ dia. uPVC pipe at Marquez St. affected by line canal constructionMarch 28, 2023 | 1-5PMBrgys. 13-15
March 27, 2023Emergency repair of 2″ dia. distribution line leak at Brgy. PawaMarch 27, 2023 | Ongoing until 7PMFrom Pawa Elementary School to Happy Homes Greenfield
March 22, 2023Low pressure and quality problems due to PhilHydro’s genset power operationuntil NGCP power supply is restoredAlmost all areas of Legazpi City
March 17, 2023Relocation of distribution line affected by ongoing construction of drainage canalMarch 18, 2023 | 9AM-12NNBrgys. 14-15, possible low pressure concerns at Brgy. 13
March 16, 2023Emergency relocation of 4″ dia. uPVC pipe at Marquez St., Brgy. 14 affected by the ongoing construction of drainage canalMarch 17, 2023 | 9AM-12NNBrgys. 13-15, possible low pressure concerns at Brgy. 12
March 13, 2023Emergency relocation of 4″ dia. uPVC pipe at Marquez St., Brgy. 14 affected by the ongoing construction of drainage canalMarch 14, 2023 | 9AM-12NNBrgys. 13-15, possible low pressure concerns at Brgy. 12
March 10, 2023Emergency relocation of 4″ dia. uPVC pipe at Marquez St., Brgy. 14 affected by the ongoing construction of drainage canalMarch 10, 2023 | 2-6PMBrgys. 13-15, possible low pressure concerns at Brgy. 12
March 8, 2023Emergency relocation of 4″ dia. uPVC pipe at Marquez St., Brgy. 14 affected by ongoing line canal constructionMarch 9, 2023 | 1-6PMBrgys. 13-15, possible low pressure concerns at Brgy. 12
March 8, 2023Emergency relocation of 4″ dia distribution line at Marquez St., Brgy. 15 Ilawod East affected by ongoing line canal constructionMarch 8, 2023 | Ongoing until 12NNBrgys. 14 and 15, possible low pressure concerns at Brgy. 13
March 3, 2023Emergency relocation of 4″ dia. distribution line at Marquez St., Brgy. 15 – Ilawod EastMarch 3, 2023 | Ongoing until 12NNBrgys. 14 and 15, possible low pressure concerns at Brgy. 13
March 2, 2023Emergency relocation of 4″ dia. distribution line at Brgy. 15 affected by ongoing construction of drainage canalMarch 2, 2023 | Ongoing until 12NNBrgy. 15 Ilawod East
February 23, 2023Emergency relocation of 4″ dia. uPVC pipe affected by ongoing construction of drainage canalFebruary 23, 2023 | Ongoing until 5PMMarquez Street
February 20, 2023Emergency repair of 4″ dia. distribution line leak affected by the ongoing line canal constructionFebruary 20, 2023 | Ongoing until 12NNBrgy. Pawa
February 17, 2023Extended flushing activity due to delayed maintenance work at PhilHydro Inc.’s plantFebruary 17, 2023 | ongoing until midnightBrgys. 1-41 and 57-59
February 16, 2023Low pressure due to regulation of water Supply by Philippine Hydro, Inc.February 16, 2023Almost all areas of Legazpi City
February 14, 2023Scheduled Philippine Hydro Inc.’s 12-hour Total Plant Shutdown to conduct interconnection of clarifier to water treatment plantFebruary 16-17, 2023 | 2PM-2AMBrgys. 1-41 and 57-59
February 13, 2023Emergency Repair of damaged fuse cut out of the two (2) wells at Brgy. Bonga causing low pressure to no water concernsOngoing until further noticeBrgys. Bonga, Mabinit, Matanag, and Bagong Abre
February 8, 2023Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Pawa (near fish market) affected by the ongoing Line Canal ConstructionOngoing until 12NNBrgy. Pawa
February 5, 2023Interconnection of Metered Discharge Pipeline of Villa Cristina’s elevated tank to the Distribution SystemFebruary 8, 2023 | 8AM-5PMVilla Cristina Subdivision
February 1, 2023Emergency Relocation of 4″ dia. uPVC Pipe Near Pawa Elementary School affected by Construction of Drainage CanalOngoing until 4PMBrgy. Pawa
January 27, 2023Low Pressure to No Water and Quality ConcernsUntil normal supply from PhilHydro resumesAlmost all areas of Legazpi City
January 23, 2023Installation of Discharge Flow Meter at Camp Simeon Ola’s elevated Water TankJanuary 27, 2023 | 8AM-5PMCamp Simeon Ola
January 13, 2023Low Pressure to No Water and Quality ConcernUntil normal water supply from PhilHydro resumesAlmost all areas of Legazpi City
January 10, 2023Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. 15 affected by ongoing Line Canal ConstructionOngoing until 12NNBrgy. 15 – Ilawod East
January 6, 2023Scheduled Maintenance Activity at PhilHydro, Inc’s Plant (replacement of blow-off valve)January 11-12, 2023 | 10PM to 4AMBrgys. 1-41, 57-59
December 19, 2022Low Pressure to No Water and Quality ConcernUntil normal water supply from PhilHydro resumesAlmost all areas of Legazpi City
December 15, 2022Emergency Repair of 8″ dia. Main Line Leak along Rizal St. (in front of Bicol University Main Campus)5PM to 10PMBrgys. 1 EM’s Barrio, 2-EM’s Barrio South, 3-EM’s Barrio East, Sagpon, BRTTH Compound, Camp Simeon Ola, and Bagtang
December 14, 2022Low Pressure to No Water at Brgy. Taysan caused by Suspension of Water Rationing due to Maintenance Check-up of Lorry TruckDecember 15, 2022Brgy. Taysan
December 14, 2022Installation of Discharge Flowmeters at the Elevated Tanks of Renaissance Garden and Villa Cristina SubdivisionRenaissance Garden – December 15 | 8AM to 5PM

Villa Cristina Subdivision – December 16 | 8AM to 5PM
Renaissance Garden and Villa Cristina Subdivision
December 14, 2022Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Pawa affected by Construction of Line Canal DrainageOngoing until 12NNBrgys. Pawa, San Joaquin, Tamaoyan, and Dita
December 13, 2022Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. 17 IlawodOngoing until 2PMPortion of Brgy. 17 – Ilawod
December 13, 2022Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Pawa affected by the ongoing Construction of Line Canal DrainageOngoing until 11AMPortion of Brgy. Rawis, Brgys. Dita, Pawa, Tamaoyan, and San Joaquin
December 12, 2022Emergency Elevation of 2″ dia. Distribution Line at Brgy. Dita affected by ongoing Construction of Line Canal Drainage2PM – 5PMPortion of Brgy. Dita (from Abadeza’s Residence to Garbin’s Residence only)
December 12, 2022Low pressure to no water caused by damaged 50HP pump at Binanuahan Pumping StationDecember 12, 2022Brgys. Puro and Buraguis
December 6, 2022Installation of Discharge Flowmeters at the Overhead Tanks of Anahaw Village and Central City SubdivisionCentral City Subdivision -December 7 | 8-5PM

Anahaw Village – December 9 | 8-5PM
Anahaw Village and Central City Subdivision
December 6, 2022Emergency repair of 4″ dia. Distribution Line Leak at Brgy. Bagong Abrea affected by ongoing Road ConstructionOngoing until 2PMBrgy. Bagong Abre
December 2, 2022Emergency Repair of Distribution Line Leak at Brgy. Dita affected by ongoing Road ConstructionOngoing until 5PMBrgy. Dita (portion near Gabin’s residence to Abadeza’s residence)
December 1, 2022Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Bagong Abre affected by ongoing Road ConstructionOngoing until 6PMBrgys. Bagong Abre, Bogña, Matanag, (portion of) Dita, and Arimbay
November 28, 2022Emergency assessment of Taysan Pumping Station3PM to 4PMBrgy Taysan
November 25, 2022Emergency Repair or 3″ dia. Distribution Line Leak at Brgy. Dita affected by ongoing Road WideningOngoing until 4PMBrgys. Dita and San Joaquin
November 20, 2022Water Storage Advisory
Please save and store extra water in preparation for the gate valves’ valving activity on November 21
November 21, 2022 | 8AM-5PMWhole area of Legazpi City, especially areas from BRTTH to Old Albay District and Legazpi City proper
November 17, 2022Valving of gate valves along the transmission pipelines at Brgy. Bogtong and simultaneous pressure monitoring and flushing within Legazpi CityNovember 21, 2022 | 8AM-5PMWhole area of Legazpi City, especially areas from BRTTH to Old Albay District and Legazpi City proper
November 15, 2022Low pressure to no water and quality concernUntil normal water supply from PhilHydro resumesAlmost all areas of Legazpi City
November 9, 2022Emergency repair of 2″ dia. distribution line leak at the boundaries of Brgy. Bagong Abre and Brgy. Arimbay affected by ongoing line canal constructionOngoing until 2PMBliss, Brgy. Bagong Abre and Brgy. Arimbay
November 9, 2022Emergency repair of damaged 2″ dia. blow-off at Brgy. Buyoan affected by ongoing road wideningOngoing until 12NNBrgy. Buyoan and upper portion of Brgy. Matanag
November 8, 2022Emergency repair of 8″ dia. Main Line leak near La Piazza hotelOngoing until 10PMRight side of Imelda Roces Avenue (from Marison Hotel to traffic light)
November 7, 2022Emergency replacement of 3″ dia. distribution line at the boundaries of Brgy. Arimbay and Brgy. Bagong Abre affected by ongoing construction of drainage canalOngoing until 5PMBliss, Brgy. Bagong Abre
November 7, 2022Cleaning of the 150 cu.m. and 120 cu.m. ground reservoir9AM to 9PMImperial Ridgeview Subd., Brgy. 57 Dap-dap, Brgy. 27 Victory Village, and Brgy. Buraguis (OLV, PBN and Seaview)
November 5, 2022Emergency Repair of 4″ Dia. Distribution Line Leak at Brgy. Bagong AbreOngoing until 5PMBliss, Brgy. Bagong Abre
October 28-29, 2022Low Pressure to No Water caused by Damaged Fuse Cut Out and Primary Line of the Distribution Line of two (2) wells in Brgy, Bogña due to Fallen Tree BranchBrgys. Matanag, Bagong Abre, Buyoan, and portion of Bogña
October 28, 2022Installation of Flow Meter at EcoHomes Subdivision, Puro, Legazpi City8AM to 5PMPortion of Puro (near EcoHomes Subd.)
October 25, 2022Emergency Repair of 3″ dia. Distribution Line Leak at Brgy. San JoaquinOngoing until 4PMBrgy. San Joaquin
October 20, 2022Emergency Repair of 4″ dia. Distribution Line Leak at Brgy. Pawa and Brgy. Arimbay (near Arimbay Elementary and High School) affected by Road WideningOngoing until 2PMBrgy. Pawa and Brgy. Arimbay
October 19, 2022Emergency Repair of 2 1/2″ dia. Distribution Line Leak at Gapo, Brgy. 16 affected by Clearing ActivityOngoing until 5PMGapo and Brgy. 16
October 17, 2022Interconnection Works of 4″ UPVC Pipeline Extension at P-3 Brgy. Buyoan8AM to 5PMP-3 Brgy. Buyoan
October 14, 2022Emergency Repair at 2″ dia. Distribution Line Leak at Brgy. Dap-dapOngoing until 5PMBrgy. Dap-dap and Brgy. 27 – Victory Village
October 9, 2022Emergency Repair of 3″ dia. Distrbution Line Leak near Tanchuling Hospital affected by DrillingOngoing until 8PMImperial Court Sub., Phase 2, and parts of Brgy. Tingao
October 4, 2022Emergency Repair of 6″ dia. Distribution Line Leak at Gapo & Brgy. 16Ongoing until 8PMGapo, Brgy. 16, and Brgy. 17
September 27, 2022Emergency Replacement of 4 X 45″ UPVC Bend at P-3 Arimbay affected by Road WideningOngoing until 4PMConnections near Arimbay Elementary School
September 21, 2022Emergency Repair of 3″ Distribution Line Leak at Brgy. Dita (affected by Road Construction)Ongoing until 5PMBrgy. Dita
September 16, 2022Replacement of 2″ Gate Valve at Brgy. Rawis (in front of Padre Pio Church)9AM to 5PMBrgy. Rawis (right side going to centro of Legazpi)
September 14, 2022Emergency Repair of 8″ Main Line at Brgy. Pawa Affected by Road WideningRepair completed at 7PMBrgys. Tamaoyan Oro Land and Rawis
September 14, 2022Emergency 12″ Pipe Line Leak Repair at Brgy. BogtongOngoing until 11AMBrgy. Bogtong
September 13, 2022Emergency Distribution Line Leak Repair at Brgy. BogñaOngoing until 12NNBrgy. Bogña and Brgy. Dita
September 11, 2022Emergency Distribution Line Leak Repair at Brgy. BogñaOngoing until 5PMBrgy. Bogña and Brgy. Dita
September 10 to 11, 2022Scheduled Maintenance/ Replacement of Water Treatment Plant Components at PhilHydro, Inc. and Other Major Water Supply System Facilities7PM (Sept. 10) to 5AM (Sept. 11)Almost All Areas of Legazpi City
September 10, 2022Emergency Distribution Line Leak Repair at Brgy. TamaoyanBrgy. Tamaoyan, Oroland, and Pag-asa, Rawis
September 8, 2022Emergency Main Line Leak Repair at Rizal Street, EM’s Barrio8AM to 5PMYMCA Lane, EM’s Barrio, Sagpon and Parts of Bagtang
September 7, 2022Emergency Relocation of 4″ Distribution Line Affected by Road Widening at Brgy. Bogña1PM to 5PMPurok 7 Brgy. Bogña
September 7, 2022Emergency Relocation of Blow-off Affected by Road Widening at the Boundary of Brgy. Dita and Brgy. San JoaquinOngoing until 5PMBrgy. San Joaquin (right side going to Rawis)
September 6, 2022Cleaning of Mother Meter and Repair of Distribution Line LeakOngoing until 5PMBrgys. Pawa and Tamaoyan
September 1, 2022Emergency Leak Repair of Distribution Line affected by road widening at PawaOngoing until 5PMBrgy. Pawa, Brgy. Dita, Brgy. San Joaquin, and parts of Brgy. Tamaoyan
August 30, 2022Emergency Leak Repair of Main Line affected by road widening at Pawa3PM to 7PMBrgys. Pawa, Dita, San Joaquin, Tamaoyan, and Oro Land Rawis
August 30, 2022Emergency Leak Repair of Distribution Line affected by Road Widening at Bliss Bagong AbreOngoing until 5PMBrgys. Bagong Abre and Arimbay
August 24, 2022Emergency Replacement of 3″ Gate Valve at DitaOngoing until 5PMBrgys. Pawa and Dita
August 22, 2022Low Water Pressure to No Water and Quality Concern due to PhilHydro’s regulation of its highly turbid water sourcesEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Vilalge, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong
August 16, 2022Emergency Repair of Distribution Line affected by Road Widening at San JoaquinOngoing until 5PMBrgy. San Joaquin
August 10, 2022Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid Pawa sourceEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong
August 4, 2022Emergency Relocation of Distribution Line affected by Road Widening at San JoaquinOngoing until 5PMBrgy. San Joaquin and parts of Brgy. Dita
August 3, 2022Low Water Pressure to No Water due to PhilHydro’s regulation of its highly turbid Yawa sourceEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong
August 2, 2022Emergency Repair of Distribution Line at BarriadaOngoing until 2PMBarriada, Our Lady’s Village, and parts of Brgy. Bitano
July 30, 2022Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sourcesAlmost all areas in Legazpi
July 29, 2022Maintenance Work at Brgy. Bigaa8AM to 5PMBrgys. Bigaa, Arimbay, and Rawis
July 26, 2022Emergency Leak Repair at Brgy. BinanuahanOngoing until 6PMBrgy. Dapdap, and Ridgeview Subd., Brgy. Buraguis
July 21, 2022Interconnection Work at Brgy. Bigaa8AM to 5PMBrgys. Bigaa, Arimbay, and Rawis
July 20, 2022Emergency Water Supply Interruption due to Electrical Failure of PhilHydro’s pumpWater supply restored at 3:30PMAlmost all areas in Legazpi
July 19, 2022Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sourcesEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong
July 18, 2022Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sourcesEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong
July 12, 2022Emergency Repair of Distribution Line at the boundary of Brgys. Dita and San Joaquin4PM to 10PMBrgys. Dita and San Joaquin
July 11, 2022Low Pressure to No Water due to Damaged Well at Brgy. BongaBagong Abre, Bonga, Matanag, Buyoan, Tamaoyan, Dita, San Joaquin, portion of Pawa
July 10, 2022Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sourcesEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong
July 8, 2022Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sourcesEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogton
July 7, 2022Interconnection work at Brgy. Bigaa8AM to 5PMBrgys. Bigaa, Arimbay, and Rawis
June 29, 2022Emergency Leak RepairOngoing until 5PMBrgy. Barriada, Brgy. Bitano (including Our Lady’s Village)
June 28, 2022Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sourcesEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogton
June 28, 2022Emergency Leak Repair at San JoaquinOngoing until 5PMBrgy. Dita, Brgy. San Joaquin, and Pawa Road
June 24, 2022Emergency Leak Repair at Pag-Asa, RawisOngoing until 8PMPag-Asa, Rawis
June 20, 2022Low Water Pressure to No Water and Water Quality Concern due to PhilHydro’s regulation of its highly turbid sourcesTula-Tula, Pinaric, Cabugao, Washington Drive, Anahaw Village, Central City, Our Lady’s Village Kabisig, and other elevated areas
June 15, 2022Emergency Leak Repair at Brgy. Binanuahan (near Binanuahan pumping station)Ongoing until 5PMBrgy. Binanuahan
June 13, 2022Emergency Leak Repair at Pawa Road1:50PM to 5PMSan Joaquin, Renilisan, Rawis, Talisay St., Rawis, Purok 5 Rawis, and Pag-Asa, Rawis
June 7, 2022Interconnection Work at Brgy. Bogña8AM to 5PMBrgys. Matanag, Buyoan, Bagong Abre, and portions of Brgy. Bogña
June 7, 2022Emergency Leak Repair at Brgy. Buraguis (Ridgeview Subd.)1:50PM to 5PMBrgy. Buraguis
May 31, 2022Low Pressure to No Water and Water Quality Problems in almost all areas in Legazpi due to (PhilHydro’s) sources’ high turbidity levelUntil supply normalizesAlmost all areas in Legazpi especially elevated areas
May 28, 2022Low Pressure to No Water due to decrease in water supply from PhilHydro’s sourcesUntil supply normalizesAlmost all areas in Legazpi
May 26, 2022Emergency Leak Repair at Tektone VillageOngoing until 5PMTektone Village
May 25, 2022Emergency Leak Repair at Alternate Rd. in front of Jardin de Legazpi5PM to 8PMAlternate Road
May 19, 2022Interconnection of Transmission Line at Brgy. 49 – Bigaa8AM to 5PMBrgy. 42 – Rawis, Brgy. 47 – Arimbay, and Brgy. 49 – Bigaa
May 18, 2022Emergency Leak Repair at Brgy. 22 due to the damage caused by the line canal contractorOngoing until 5PMBrgy. 22 – Binanuahan, Brgy. Dap-dap, and Ridgeview Subd., Buraguis
May 18, 2022Emergency Leak Repair due to the damage caused by the road widening contractorOngoing until 11PMBrgys. Rawis, Arimbay, Bigaa, and San Joaquin
May 12, 2022Interconnection work at Brgy. 49 – Bigaa8AM to 5PMBrgy. 49 – Bigaa, Brgy. 47 – Arimbay, and Brgy. 42 – Rawis
May 10, 2022Emergency Leak Repair at Brgy. 46 – San Joaquin3PM to 6PMBrgy. 46 – San Joaquin
April 27, 2022Emergency Leak Repair at Pag-Asa – Tamaoyan bridge due to the damage caused by the line canal contractorOngoing until 10PMBrgy. 42 – Rawis (Pag-Asa and City Heights Subdivision) and Brgy. 43 – Tamaoyan
April 13, 2022Emergency Leak Repair at Brgy. Bogtong10AM to 12NNBrgy. Bogtong
April 8, 2022Emergency Leak Repair near Metrobank Rizal St. due to the damage caused by the canal construction contractor8AM to 5PMBrgys. Baybay, Pigcale, Orosite, Lapu-Lapu, Centro Legazpi (from Metrobank to St. Raphael Church), and Rizal St. (portion of centro Legazpi)
March 30, 2022Emergency Leak Repair at Mabini St. due to the damage caused by the canal construction contractorOngoing until 10PMMabini St., Brgy. Sabang, Brgy. Pigcale, and Brgy. Dinagaan
March 29, 2022Installation of Gate Valve at Purok 71PM to 5PMBrgy. 52 – Matanag and Brgy. 48 – Bagong Abre (including Bliss Area)
March 28, 2022Emergency Leak Repair at Brgy. 45 – Dita due to the damage caused by the road widening contractorOngoing until 10PMBrgy. 45 – Dita and Brgy. 46 – San Joaquin
March 27, 2022Emergency Leak Repair at Brgy. Rawis near Rawis-Arimbay bridgeOngoing until 12MNBrgy. Rawis including Regional Center Site
March 26, 2022Emergency Leak Repair near Legazpi Savings BankOngoing until 8PMMabini Street, Brgy. Sabang, and Brgy. Pigcale
March 26, 2022Emergency Leak Repair due to the damage caused by the ongoing canal constructionOngoing until 5PMBrgy. Sabang and Brgy. Pigcale
March 25, 2022Emergency Leak Repair at Brgy. DitaOngoing until 6PMBrgy. Dita and Brgy. San Joaquin
March 24, 2022Emergency Leak Repair at Brgy. Pawa BaladingOngoing until 5PMBrgys. Pawa, San Joaquin, Dita, Rawis (Pag-Asa and Oroland), and Tamaoyan
March 24, 2022Emergency Repair at Brgy. Taysan (near barangay hall)9AM to 5PMBrgy. 56 – Taysan
March 21, 2022Emergency Leak Repair at Brgy. Baybay in front of Hotel St. EllisOngoing until 9PMBrgys. Pigcale, Baybay, and Sabang
March 20, 2022Emergency Leak Repair at Brgy. Bogtong (near Seaoil)Ongoing until 8PMPortion of Brgy. Bogtong, Brgy. Bonot (Renelisan area), and areas near SM Legazpi
March 19, 2022Emergency Leak Repair at Brgy. Pawa (Balading)Ongoing until 8PMBrgys. Tamaoyan and Pag-Asa Rawis including Oro Land Subdivision
March 18, 2022Emergency Repair in Brgy BongaOngoing until 11AMBrgys. Bonga, Dita, San Joaquin, Rawis (Oro Land and and Pag-Asa), and Tamaoyan
March 2, 2022Emergency Leak Repair at Brgy. PigcaleOngoing until 11PMBrgys. Pigcale, Sabang, and portion of Victory Village
February 28, 2022Emergency repair at Brgy. 56 – Taysan due to the damage caused by the canal construction contractorOngoing until 5PMBrgy. 56 – Taysan
February 24, 2022Emergency relocation of Distribution Line affected by canal construction in front of Taysan Elementary School8AM to 5PMBrgy. 56 – Taysan
February 15, 2022Interconnection work near Buyoan Elementary School9AM to 5PMBrgys. 42 – Rawis, 47- Arimbay, and 49 – Bigaa (including Sitio Israel)
February 10, 2022Emergency leak repair at Brgy. 44 – PawaOngoing until 5PMBrgys. 44 – Pawa, 46 – San Joaquin, 45 – Dita, 43 – Tamaoyan, 42 – Rawis (Pag-Asa and Oro Land)
February 8-9, 2022Emergency leak repair of distribution line at Brgy. 25 – Lapu-lapu (beside Imperial appliance)4:30PM to 12MNBrgy. 25 – Lapu-lapu
January 27, 2022Emergency leak repair at Brgy. 31 Baybay (centro) near PNB9:30AM to 3PMBrgys. Baybay, Sabang, Victory Village, and Pigcale
January 27, 2022Emergency pump repair at Brgy. 54 – Mabinit8:30AM to 5PMBrgy. 54 – Mabinit
January 21, 2022Emergency leak repair at Brgy. BogtongOngoing until 12NNBrgy. Bogtong
January 19, 2022Emergency leak repair at Bagong AbreOngoing until 5PMBrgy. Bagong Abre (including Bliss area)
January 4, 2022Low Water Pressure to No WaterUntil PhilHydro’s supply normalizesEM’s Barrio, Central City, Cruzada, Washington, Teacher’s Village, St. Dominic, Maoyod, Cabugao, Pinaric, Tula-Tula, Bañadero, Bogtong, Tahao Road, Gogon